2194 contratti, 2,25 Mld USD, 1088 imprese diverse. Il 73 % del valore è andato a imprese del paese.
Imprese che vincono di più
| Impresa | Paese d'origine | Contratti | Valore | Categoria principale |
|---|---|---|---|---|
| NATIONAL DEVELOPMENT ENGINEERS LTD. | Bangladesh | 7 | 131 Mln USD | Works |
| MONICO LIMITED | Bangladesh | 5 | 88,7 Mln USD | Works |
| China Road And Bridge Corporation | null | 1 | 66,2 Mln USD | Works |
| UNITED NATIONS CHILDREN'S FUND (UNICEF) | World | 6 | 63,8 Mln USD | Non-consulting Services |
| INTERNATIONAL ORGANIZATION FOR MIGRATION (IOM) | World | 3 | 63 Mln USD | Non-consulting Services |
| China Railway Construction Bridge Engineering Bureau Group Co.,Ltd | Cina | 4 | 47,3 Mln USD | Works |
| MUHAMMAD AMINUL HAQUE (PVT.) LTD. | Bangladesh | 4 | 47,3 Mln USD | Works |
| CHINA RAILWAY NO. 4 ENGINEERING GROUP CO. LTD. | Cina | 1 | 44,6 Mln USD | Works |
| WORLD FOOD PROGRAMME (WFP) | World | 2 | 41,7 Mln USD | Non-consulting Services |
| TOMA CONSTRUCTION AND CO. LTD. | Bangladesh | 1 | 37,4 Mln USD | Works |
| UNITED NATIONS POPULATION FUND (UNFPA) | World | 5 | 37,1 Mln USD | Non-consulting Services |
| WAHID CONSTRUCTION LTD. (WCL) | Bangladesh | 4 | 31,9 Mln USD | Works |
| TIANEN CONSTRUCTION GROUP CO., LTD. | Cina | 3 | 31,5 Mln USD | Works |
| INDIVIDUAL CONSULTANT | Bangladesh | 419 | 24,4 Mln USD | Consultant Services |
| M JAMAL & COMPANY LIMITED | Bangladesh | 2 | 24,1 Mln USD | Works |
Contratti aggiudicati di recente
| Data | Impresa | Oggetto | Valore | Procedura |
|---|---|---|---|---|
| 5 novembre 2026 | M/S ABSER CONSTRUCTION | Improvement of Incomplete Road (Carry Forward from EMCRP) at Pekua Upazila under Cox’s Bazar District Host and Rohingya Enhancement of Lives Project ↗ | 408K USD | Request for Bids |
| 5 novembre 2026 | M/S ABSER CONSTRUCTION | Improvement of Incomplete Road (Carry Forward from EMCRP) at Chakaria Upazila under Cox’s Bazar District Host and Rohingya Enhancement of Lives Project ↗ | 1,03 Mln USD | Request for Bids |
| 4 novembre 2026 | M/S MIZAN ENTERPRICE | Rehabilitation of 17.968km Emergency Evacuation Rural Road under B-STRONG project (LGED Part) at Burichong Upazila, District: Cumilla. Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 1,24 Mln USD | Request for Bids |
| 3 novembre 2026 | HASSAN TECHNO BUILDERS LTD. | Improvement of Bander tila-Nijumdip (Namar bazar) Road by RCC with Block From Ch: 00-9336m under Hatia Upazila, District: Noakhali. Host and Rohingya Enhancement of Lives Project ↗ | 3,1 Mln USD | Request for Bids |
| 27 ottobre 2026 | INDIVIDUAL CONSULTANT | Architectural Engineering Consultant Host and Rohingya Enhancement of Lives Project ↗ | 20,2K USD | Individual Consultant Selection |
| 26 ottobre 2026 | INDIVIDUAL CONSULTANT | Consulting Services of Individual Consultant of Waste Management Specialist Bangladesh Resilient Urban and Territorial Development Project ↗ | 105K USD | Individual Consultant Selection |
| 26 ottobre 2026 | M/S. ANWARA FOUNDATION | Improvement of Incomplete Road (Carry Forward from EMCRP) at Ukhiya Upazila under Cox’s Bazar District Host and Rohingya Enhancement of Lives Project ↗ | 685K USD | Request for Bids |
| 26 ottobre 2026 | HASAN ENTERPRISE | Improvement of Incomplete Road (Carry Forward from EMCRP) at Teknaf Upazila under Cox’s Bazar District Host and Rohingya Enhancement of Lives Project ↗ | 155K USD | Request for Bids |
| 25 ottobre 2026 | INDIVIDUAL CONSULTANT | Procurement of services of Monitoring Engineer Resilient Infrastructure for Adaptation and Vulnerability Reduction ↗ | 82,2K USD | Individual Consultant Selection |
| 25 ottobre 2026 | M/S EMMU CONSTRUCTION | Improvement of Incomplete Road (Carry Forward from EMCRP) at Sadar Upazila under Cox’s Bazar District Host and Rohingya Enhancement of Lives Project ↗ | 566K USD | Request for Bids |
| 25 ottobre 2026 | K HOSSEN AND CO | Improvement of Incomplete Road (Carry Forward from EMCRP) at Sadar Upazila under Cox’s Bazar District Host and Rohingya Enhancement of Lives Project ↗ | 566K USD | Request for Bids |
| 25 ottobre 2026 | BIGAPPLE BUILDERS LTD. | Improvement of Incomplete Road (Carry Forward from EMCRP) at Moheskhali Upazila under Cox’s Bazar District Host and Rohingya Enhancement of Lives Project ↗ | 583K USD | Request for Bids |
| 19 ottobre 2026 | M/S.QUASHEM CONSTRUCTION | Rehabilitation of 8.285 km Emergency Evacuation Rural Road including re-construction of 9.0 m Box Culvert under B-STRONG project (LGED Part) at Hathazari Upazil Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 800K USD | Request for Bids |
| 18 ottobre 2026 | BANGLADESH RURAL ADVANCEMENT COMMITTEE | Skills & Social Development Program at BSMSN, Package no.: PMC-17 R-2-BSMSN-BEZA Bangladesh Private Investment & Digital Entrepreneurship Project ↗ | 1,06 Mln USD | Fixed Budget Selection |
| 18 ottobre 2026 | GLOBAL BRAND PLC. | Supply and Operation of Desktop Computers Accelerating and Strengthening Skills for Economic Transformation ↗ | 1,59 Mln USD | Request for Bids |
| 15 ottobre 2026 | PROGOTI INDUSTRIES LIMITED | Procurement of Micro-bus Host and Rohingya Enhancement of Lives Project ↗ | 42,3K USD | Request for Bids |
| 13 ottobre 2026 | TURN | Construction of Solid Waste Management, Package No.: WD-16-NSEZ-BEZA Bangladesh Private Investment & Digital Entrepreneurship Project ↗ | 2,26 Mln USD | Request for Bids |
| 13 ottobre 2026 | M/S. ANWARA FOUNDATION | Construction of Solid Waste Management, Package No.: WD-16-NSEZ-BEZA Bangladesh Private Investment & Digital Entrepreneurship Project ↗ | 2,26 Mln USD | Request for Bids |
| 11 ottobre 2026 | M/S KHAN TRADERS | Procurement of hose pipe for irrigation scheme (1set equal to 100mm dia 100 m long pipe with related accessories) Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 151K USD | Request for Bids |
| 11 ottobre 2026 | INDIVIDUAL CONSULTANT | Individual Local Gender and Sexual Exploitation and Abuse (SEA)/Sexual Harassment (SH) Specialist for PIU Jamuna River Sustainable Management Project 1 ↗ | 21,9K USD | Individual Consultant Selection |
| 8 ottobre 2026 | FAABS INTERNATIONAL | Procurement of 5 KVA Transformer for LLP Scheme Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 46,2K USD | Request for Bids |
| 8 ottobre 2026 | DOHATEC NEW MEDIA | Consulting Services for Overall e-GP Enhancement, Operation and Maintenance (EOM) Strengthening Institutions for Transparency and Accountability (SITA) ↗ | 3,42 Mln USD | Direct Selection |
| 8 ottobre 2026 | BUET-JAPAN INSTITUTE OF DISASTER PREVENTION AND URBAN SAFETY (BUET-JIDPUS) | Disaster Preparedness Training for Displaced Rohingya Populations in Bhasan Char Host and Rohingya Enhancement of Lives Project ↗ | 210K USD | Direct Selection |
| 8 ottobre 2026 | INDIVIDUAL CONSULTANT | Procurement and Contract Management Consultant Resilient Infrastructure for Adaptation and Vulnerability Reduction ↗ | 139K USD | Individual Consultant Selection |
| 6 ottobre 2026 | DOCKYARD & ENGINEERING WORKS LIMITED | Construction of Drain Adjacent to Super Dyke at NSEZ, Mirsarai, Chattogram, Package No. : WD-22-NSEZ-BEZA Bangladesh Private Investment & Digital Entrepreneurship Project ↗ | 2,42 Mln USD | Request for Bids |
| 6 ottobre 2026 | CSI CONSTRUCTIONS LTD. | Construction of Drain Adjacent to Super Dyke at NSEZ, Mirsarai, Chattogram, Package No. : WD-22-NSEZ-BEZA Bangladesh Private Investment & Digital Entrepreneurship Project ↗ | 2,42 Mln USD | Request for Bids |
| 5 ottobre 2026 | TRAINING AND TECHNOLOGY TRANSFER LIMITED (TTT LTD.) | Selection of a Firm for Policy Reform Consultancy Service (Firm /International Organization /Development Partner / Others) Technical Assistance for Repurposing of Agricultural Public Support Towards a Sustainable Food System Transformation in ↗ | 88,7K USD | Consultant Qualification Selection |
| 5 ottobre 2026 | BUSINESS INITIATIVE LEADING DEVELOPMENT (BUILD) | Selection of a Firm for Policy Reform Consultancy Service (Firm /International Organization /Development Partner / Others) Technical Assistance for Repurposing of Agricultural Public Support Towards a Sustainable Food System Transformation in ↗ | 88,7K USD | Consultant Qualification Selection |
| 5 ottobre 2026 | MR. U.T.MONG | Improvement of 16.630 km Rural Roads at Subarnachar Upazila in Noakhali District Host and Rohingya Enhancement of Lives Project ↗ | 1,54 Mln USD | Request for Bids |
| 1 ottobre 2026 | CENTER FOR ENVIRONMENTAL AND GEOGRAPHIC INFORMATION SERVICES (CEGIS) | Environmental Impact and Damage Assessment of the Rohingya Inhabited Area, and a Project Preparation for Ecosystem Restoration with restoration activities Follo Host and Rohingya Enhancement of Lives Project ↗ | 117K USD | Quality And Cost-Based Selection |
| 1 ottobre 2026 | MOSTUFA ZAMAN TRADERS (PVT) LTD. | Rehabilitation of 17.554 km Emergency Evacuation Rural Road under B-STRONG project (LGED Part) at Brahmanpara Upazila, District: Cumilla. Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 2,32 Mln USD | Request for Bids |
| 29 settembre 2026 | DOHATEC NEW MEDIA | Consulting Services for “Enhancement, Operation and Maintenance of e-PMIS for IMED” Strengthening Institutions for Transparency and Accountability (SITA) ↗ | 1,44 Mln USD | Direct Selection |
| 29 settembre 2026 | M/S HOSSAIN ENTERPRISE | Construction of 04 Nos.Incomplete School cum Disaster Shelter (Carry Forward from EMCRP) at Ukhiya Upazila, Distrct: Cox`sBazar. Host and Rohingya Enhancement of Lives Project ↗ | 602K USD | Request for Bids |
| 29 settembre 2026 | M/S. MOON ENTERPRISE | Construction of 04 Nos.Incomplete School cum Disaster Shelter (Carry Forward from EMCRP) at Ukhiya Upazila, Distrct: Cox`sBazar. Host and Rohingya Enhancement of Lives Project ↗ | 602K USD | Request for Bids |
| 28 settembre 2026 | IOTA CONSULTING BD | Consulting services for Assisting BPPA to Continue ISO 27001, 9001, 14001, 22301 certifications and achieve TIA 942 Certification for Bangladesh e-GP System for Strengthening Institutions for Transparency and Accountability (SITA) ↗ | 49,4K USD | Consultant Qualification Selection |
| 28 settembre 2026 | SHUSHILAN | Implementation Support Firm for EGPP+ Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | 199K USD | Quality And Cost-Based Selection |
| 28 settembre 2026 | TRAINING AND TECHNOLOGY TRANSFER (TTT) | Implementation Support Firm for EGPP+ Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | 199K USD | Quality And Cost-Based Selection |
| 28 settembre 2026 | AL-AMIN TRADERS | Rehabilitation of 14.272 km Emergency Evacuation Rural Road including Re-construction of 16.0 m Box Culvert and 45.0m Arch Bridge under B-STRONG project at Begu Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 1,13 Mln USD | Request for Bids |
| 28 settembre 2026 | KALAI MOLLAH CONSTRUCTION | Rehabilitation of 14.272 km Emergency Evacuation Rural Road including Re-construction of 16.0 m Box Culvert and 45.0m Arch Bridge under B-STRONG project at Begu Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 1,13 Mln USD | Request for Bids |
| 28 settembre 2026 | M/S HOSSAIN ENTERPRISE | Construction of 04 Nos.Incomplete School cum Disaster Shelter (Carry Forward from EMCRP) at Ukhiya,Chakaria and Moheshkhali Upazila, Distrct: Cox`sBazar. Host and Rohingya Enhancement of Lives Project ↗ | 663K USD | Request for Bids |
| 28 settembre 2026 | M/S. MOON ENTERPRISE | Construction of 04 Nos.Incomplete School cum Disaster Shelter (Carry Forward from EMCRP) at Ukhiya,Chakaria and Moheshkhali Upazila, Distrct: Cox`sBazar. Host and Rohingya Enhancement of Lives Project ↗ | 663K USD | Request for Bids |
| 22 settembre 2026 | SHAPLA ENTERPRISE | Procurement of a) 4 Nos. Working Table b) 4 Nos. Side Table c) 4 Nos. Chair d) 140 sft Cubicle Partition e) 5 Nos. Foot Rest Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | 3,39K USD | Request for Quotations |
| 22 settembre 2026 | GLOBAL BRAND PLC. | Supply of Suitable Devices (Supply, Installation, Testing and Commissioning of Campus Network Equipment of Bangladesh Medical University (BMU) and Chittagong Un Higher Education Acceleration and Transformation Project ↗ | 1,59 Mln USD | Request for Bids |
| 21 settembre 2026 | MOHAMMED EUNUS & BROTHERS (PVT.) LTD. | Construction of 58 m (2 nos.) RCC Bridge at Hatia Upazila, Noakhali District. Host and Rohingya Enhancement of Lives Project ↗ | 721K USD | Request for Bids |
| 20 settembre 2026 | JIANGSU JUNMA ROAD ROLLER CO., LTD. (Cina) | Procurement of 42 Nos. Tandem Vibratory Road Roller (8-10.5 Ton) Bangladesh Resilient Urban and Territorial Development Project ↗ | 2 Mln USD | Request for Bids |
| 20 settembre 2026 | JIANGSU JUNMA ROAD ROLLER CO., LTD. (Cina) | Procurement of 39 Nos. Tandem Vibratory Road Roller (8-10.5 Ton) Bangladesh Resilient Urban and Territorial Development Project ↗ | 1,88 Mln USD | Request for Bids |
| 20 settembre 2026 | INDIVIDUAL CONSULTANT | Senior Financial management Specialist Strengthening Institutions for Transparency and Accountability (SITA) ↗ | 79,3K USD | Individual Consultant Selection |
| 20 settembre 2026 | M/S ZAMAN TRADERS | Rehabilitation of 13.408 km Emergency Evacuation Rural Road including re-construction of 23.30 m Box Culvert under B-STRONG project (LGED Part) at Chhagalnaiya Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 1,44 Mln USD | Request for Bids |
| 17 settembre 2026 | MOHAMMED EUNUS & BROTHERS (PVT.) | 4 Nos Construction of Primary School cum Flood Shelter with street light, Lightning protection & connecting roads, bridge/Culvert, Furniture & tree plantation ( Resilient Infrastructure for Adaptation and Vulnerability Reduction ↗ | 2,81 Mln USD | Request for Bids |
| 15 settembre 2026 | M I CHOWDHURY & CO. | Internal Audit (Firm) Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | 42,9K USD | Consultant Qualification Selection |
| 15 settembre 2026 | INDIVIDUAL CONSULTANT | Program Specialist Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | 61,1K USD | Individual Consultant Selection |
| 15 settembre 2026 | M/S S K M INTERNATIONAL | Rehabilitation of 13.095 km Emergency Evacuation Rural Road including rc-construction of 38.50 m Box Culvert under B-STRONG project (LGED Part) at Chouddagram U Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 1,97 Mln USD | Request for Bids |
| 13 settembre 2026 | M/S. HOQUE TRADERS | Rehabilitation of 10.452 km Emergency Evacuation Rural Road including re-construction of 10.00 m Box Culvert under B-STRONG Project (LGED Part) at Sonagazi Upaz Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 1,23 Mln USD | Request for Bids |
| 13 settembre 2026 | SHAIKAT ENTERPRISE | Improvement of Community Infrastructure, Growth Center, others roads & Connecting Roads at Madaripur Districts Resilient Infrastructure for Adaptation and Vulnerability Reduction ↗ | 1,25 Mln USD | Request for Bids |
| 10 settembre 2026 | S.F. AHMED AND CO. CHARTERED ACCOUNTANTS | Consulting Services for Professional Audit Resilient Infrastructure for Adaptation and Vulnerability Reduction ↗ | 32,7K USD | Consultant Qualification Selection |
| 10 settembre 2026 | AL-AMIN TRADERS | Improvement of Community Infrastructure, Growth Center, others roads & Connecting Roads at Faridpur Districts Resilient Infrastructure for Adaptation and Vulnerability Reduction ↗ | 1,26 Mln USD | Request for Bids |
| 9 settembre 2026 | OCEAN ENTERPRISE | MSR (Gauze,Cotton & Others) Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | 711K USD | Request for Bids |
| 9 settembre 2026 | ANIFCO HEALTHCARE | MSR (Surgical Goods) Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | 894K USD | Request for Bids |
| 9 settembre 2026 | HTMS LIMITED | MSR (Linen Goods) Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | 87K USD | Request for Bids |
| 7 settembre 2026 | ABUL & BROTHERS (PVT.) LTD | Rehabilitation of 18.54 km Emergency Evacuation of Rural Roads including reconstruction of 7.0m RCC Box Culvert under B Strong(LGED Part) at Ramganj upazila, La Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 871K USD | Request for Bids |
Contract award prices in Bangladesh
The median is the middle amount: half of the contracts are below it, half above. The range goes from the cheapest quarter to the most expensive quarter.
| Type of contract | Contracts | Median | Usual range | Largest contract |
|---|---|---|---|---|
| Goods | 529 | 46,6K USD | 6,8K USD – 311K USD | 12,8 Mln USD |
| Works | 817 | 541K USD | 86,9K USD – 1,5 Mln USD | 66,2 Mln USD |
| Consulting services | 759 | 69,3K USD | 31,5K USD – 180K USD | 6,72 Mln USD |
| Other services | 89 | 145K USD | 51,1K USD – 795K USD | 40 Mln USD |
These amounts cover contracts of very different sizes: compare your price with contracts of the same nature and size, and with the project budget if it is published.
Progetti finanziati: in preparazione e in corso
I progetti in preparazione pubblicheranno le loro gare nei prossimi mesi. Registratevi come fornitori presso l'ente beneficiario e seguite i suoi avvisi.
| Progetto | Stato | Importo impegnato | Approvazione | Chiusura | Settore |
|---|---|---|---|---|---|
| Gas Sector Reform and Energy Security Project ↗ | In preparazione | 350 Mln USD | |||
| Bangladesh: Digital Service Transformation for Access and Resilience ↗ | In preparazione | 300 Mln USD | |||
| Bangladesh Growth, Finance and Competitiveness DPC1 ↗ | In preparazione | 250 Mln USD | |||
| BD PPF ↗ | In preparazione | 50 Mln USD | |||
| Strengthening Social Protection for Improved Resilience, Inclusion and Targeting ↗ | In preparazione | – | |||
| Bangladesh: Strengthening Governance and Institutional Resilience ↗ | In preparazione | – | |||
| Metro Dhaka Water Security and Resilience Program ↗ | In preparazione | – | |||
| Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | In preparazione | – | |||
| Bangladesh Clean Air Project ↗ | In preparazione | – | |||
| BPPF ↗ | In preparazione | – | |||
| Strengthening Institutions for Transparency and Accountability (SITA) ↗ | In preparazione | – | |||
| Financial Sector Support Project II ↗ | In preparazione | – | |||
| Accelerating Transport and Trade Connectivity in Eastern South Asia – Bangladesh Phase 1 Project ↗ | In corso | 753 Mln USD | 28 giugno 2022 | 30 giugno 2028 | Public Administration - Transportation |
| Quality Learning for All Program ↗ | In corso | 700 Mln USD | 14 giugno 2018 | 31 dicembre 2024 | Primary Education |
| Bay Terminal Marine Infrastructure Development Project ↗ | In corso | 650 Mln USD | 28 giugno 2024 | 30 giugno 2031 | |
| Additional Financing for and Restructuring of the COVID-19 Emergency Response and Pandemic Preparedness Project ↗ | In corso | 600 Mln USD | 18 marzo 2021 | Health | |
| Program on Agricultural and Rural Transformation for Nutrition, Entrepreneurship, and Resilience in Bangladesh(PARTNER) ↗ | In corso | 543 Mln USD | 27 aprile 2023 | 31 dicembre 2028 | Agricultural Extension, Research, and Other Support Activiti |
| Electricity Distribution Modernization Program ↗ | In corso | 528 Mln USD | 21 dicembre 2021 | 31 dicembre 2026 | Energy Transmission and Distribution |
| Second Bangladesh Green and Climate Resilient Development Credit ↗ | In corso | 500 Mln USD | 19 dicembre 2024 | 15 gennaio 2026 | |
| Bangladesh Second Recovery and Resilience DPC ↗ | In corso | 500 Mln USD | 21 giugno 2024 | 30 giugno 2025 | |
| Resilient Infrastructure for Adaptation and Vulnerability Reduction ↗ | In corso | 500 Mln USD | 15 luglio 2022 | 30 giugno 2028 | Other Public Administration |
| Western Economic Corridor and Regional Enhancement Program ↗ | In corso | 500 Mln USD | 23 giugno 2020 | 31 dicembre 2026 | Rural and Inter-Urban Roads |
| Bangladesh Private Investment & Digital Entrepreneurship Project ↗ | In corso | 500 Mln USD | 19 giugno 2020 | 31 dicembre 2025 | Other Industry, Trade and Services |
| Livestock and Dairy Development Project ↗ | In corso | 500 Mln USD | 6 dicembre 2018 | 31 luglio 2025 | Livestock |
| Safety Net Systems for the Poorest ↗ | In corso | 500 Mln USD | 26 giugno 2013 | 31 dicembre 2024 | Social Protection |
| Enhancement and Strengthening of Power Transmission Network in Eastern Region ↗ | In corso | 451 Mln USD | 29 marzo 2018 | 30 giugno 2025 | Renewable Energy Solar |
| Operation for Supporting Rural Bridges (SupRB) ↗ | In corso | 425 Mln USD | 25 ottobre 2018 | 30 giugno 2025 | Rural and Inter-Urban Roads |
| Bangladesh Resilient Urban and Territorial Development Project ↗ | In corso | 400 Mln USD | 21 giugno 2024 | 31 ottobre 2030 | |
| BD Rural Water, Sanitation and Hygiene for Human Capital Development Project ↗ | In corso | 400 Mln USD | 25 settembre 2020 | 31 ottobre 2025 | Public Administration - Water, Sanitation and Waste Manageme |
| Health, Nutrition and Population Sector Development Program ↗ | In corso | 379 Mln USD | 19 dicembre 2024 | 30 giugno 2029 | |
| Multipurpose Disaster Shelter Project ↗ | In corso | 375 Mln USD | 16 dicembre 2014 | 31 dicembre 2024 | Other Water Supply, Sanitation and Waste Management |
| Bangladesh Regional Waterway Transport Project 1 ↗ | In corso | 360 Mln USD | 16 giugno 2016 | 31 dicembre 2025 | Ports/Waterways |
| Bangladesh Road Safety Project ↗ | In corso | 358 Mln USD | 28 marzo 2022 | 30 giugno 2027 | Rural and Inter-Urban Roads |
| Dhaka Sanitation Improvement Project ↗ | In corso | 340 Mln USD | 20 marzo 2020 | 30 aprile 2027 | Sanitation |
| Learning Acceleration in Secondary Education Operation ↗ | In corso | 300 Mln USD | 22 settembre 2023 | 31 dicembre 2028 | Secondary Education |
| GAS SECTOR EFFICIENCY IMPROVEMENT AND CARBON ABATEMENT PROJECT ↗ | In corso | 300 Mln USD | 27 luglio 2023 | 31 dicembre 2028 | Oil and Gas |
| Economic Acceleration and Resilience for NEET (EARN) ↗ | In corso | 300 Mln USD | 29 giugno 2023 | 31 dicembre 2028 | Workforce Development and Vocational Education |
| Local Government COVID-19 Response & Recovery Project ↗ | In corso | 300 Mln USD | 24 febbraio 2022 | 31 dicembre 2025 | Public Administration - Health |
| Accelerating and Strengthening Skills for Economic Transformation ↗ | In corso | 300 Mln USD | 20 maggio 2021 | 31 dicembre 2026 | Workforce Development and Vocational Education |
| Resilience, Entrepreneurship and Livelihood Improvement Project ↗ | In corso | 300 Mln USD | 20 maggio 2021 | 28 maggio 2026 | Other Agriculture, Fishing and Forestry |
| Cash Transfer Modernization Project ↗ | In corso | 300 Mln USD | 31 gennaio 2018 | 31 marzo 2025 | Social Protection |
| BD: Enhancing Digital Government & Economy Project ↗ | In corso | 295 Mln USD | 19 giugno 2020 | 30 settembre 2025 | Central Government (Central Agencies) |
| Chattogram Water Supply Improvement Project ↗ | In corso | 280 Mln USD | 19 dicembre 2024 | 31 dicembre 2030 | |
| Sustainable Microenterprise and Resilient Transformation (SMART) ↗ | In corso | 250 Mln USD | 27 aprile 2023 | 31 dicembre 2028 | Banking Institutions |
| Bangladesh Environmental Sustainability and Transformation Project ↗ | In corso | 250 Mln USD | 1 dicembre 2022 | 31 dicembre 2028 | Other Public Administration |
| Safety Net Systems for the Poorest (Additional Financing) ↗ | In corso | 245 Mln USD | 15 dicembre 2017 | Public Administration - Social Protection | |
| Bangladesh Scaling-up Renewable Energy Project ↗ | In corso | 244 Mln USD | 1 marzo 2019 | 31 luglio 2025 | Renewable Energy Solar |
| Bangladesh Sustainable Coastal and Marine Fisheries ↗ | In corso | 240 Mln USD | 5 ottobre 2018 | 30 giugno 2025 | Fisheries |
| Bangladesh Enhancing Investments and Benefits for Early Years (BEIBEY) Project ↗ | In corso | 210 Mln USD | 31 ottobre 2023 | 31 ottobre 2028 | Social Protection |
| Bangladesh Modern Food Storage Facilities Project ↗ | In corso | 210 Mln USD | 30 dicembre 2013 | 31 dicembre 2024 | Social Protection |
| Higher Education Acceleration and Transformation Project ↗ | In corso | 209 Mln USD | 24 giugno 2021 | 31 dicembre 2027 | Tertiary Education |
| Additional Financing For Modern Food Storage Facilities Project ↗ | In corso | 202 Mln USD | 31 luglio 2020 | Other Agriculture, Fishing and Forestry | |
| Urban Health, Nutrition and Population Project ↗ | In corso | 200 Mln USD | 30 agosto 2023 | 31 dicembre 2028 | Public Administration - Health |
| Recovery and Advancement of Informal Sector Employment ↗ | In corso | 200 Mln USD | 15 marzo 2021 | 30 giugno 2026 | Social Protection |
| COVID-19 Emergency Response and Pandemic Preparedness Project ↗ | In corso | 200 Mln USD | 3 aprile 2020 | 31 dicembre 2024 | Health |
| Bangladesh Municipal Water Supply and Sanitation Project ↗ | In corso | 200 Mln USD | 11 luglio 2019 | 31 dicembre 2024 | Water Supply |
| Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | In corso | 193 Mln USD | 28 maggio 2024 | 30 giugno 2028 | |
| Sustainable Forests & Livelihoods (SUFAL) Project ↗ | In corso | 175 Mln USD | 5 ottobre 2018 | 30 giugno 2025 | Forestry |
| Emergency Multi-Sector Rohingya Crisis Response Project ↗ | In corso | 165 Mln USD | 7 marzo 2019 | 30 giugno 2025 | Public Administration - Social Protection |
| Health and Gender Support Project for Cox’s Bazar district ↗ | In corso | 150 Mln USD | 31 marzo 2020 | 31 dicembre 2024 | Health |
Vedere le gare 26 Fornitori e prestatori in Bangladesh → Tutti i paesi
Fonte: Banca Mondiale, Contract Awards in Investment Project Financing e API dei progetti, licenza CC BY 4.0. Aggiornato: 17 novembre 2026. Importi in dollari USA.