266 contratti, 26,5 Mln USD, 169 imprese diverse. Il 21 % del valore è andato a imprese del paese.
Imprese che vincono di più
| Impresa | Paese d'origine | Contratti | Valore | Categoria principale |
|---|---|---|---|---|
| PIETRANGELI SAFE SRL | Italia | 1 | 3,68 Mln USD | Consultant Services |
| SMEC INDIA PRIVATE LIMITED | India | 1 | 3,68 Mln USD | Consultant Services |
| CONSULTING ENGINEERS GROUP LIMITED | India | 1 | 2,86 Mln USD | Consultant Services |
| DOHWA ENGINEERING CO., LTD (DOHWA) | Corea del Sud | 1 | 2,86 Mln USD | Consultant Services |
| ARUP INTERNATIONAL PROJECTS LIMITED | RAS di Hong Kong | 1 | 1,37 Mln USD | Consultant Services |
| INDIVIDUAL CONSULTANT | Bhutan | 35 | 1,32 Mln USD | Consultant Services |
| PRICEWATERHOUSECOOPERS PVT. LTD, INDIA (PWCPL, INDIA) | India | 1 | 1,2 Mln USD | Consultant Services |
| TRAINING AND TECHNOLOGY TRANSFER LTD. (TTT LTD) | Nuova Zelanda | 1 | 1,2 Mln USD | Consultant Services |
| BHUTAN NDI LIMITED | Bhutan | 1 | 835K USD | Goods |
| WSO2 LLC | Stati Uniti | 1 | 636K USD | Goods |
| ASIAN DISASTER PREPAREDNESS CENTER | Thailandia | 2 | 524K USD | Consultant Services |
| C. WANGCHUK CONSTRUCTION | Bhutan | 2 | 392K USD | Works |
| BHUTAN ECOLOGICAL SOCIETY | Bhutan | 1 | 354K USD | Consultant Services |
| DELOITTE TOUCHE TOHMATSU INDIA LLP | India | 1 | 352K USD | Consultant Services |
| DEPEL AGRO TECH PVT LTD | Bhutan | 4 | 333K USD | Goods |
Contratti aggiudicati di recente
| Data | Impresa | Oggetto | Valore | Procedura |
|---|---|---|---|---|
| 23 ottobre 2026 | WSO2 LLC (Stati Uniti) | Subscription Renewal for the National Data Exchange(NDE) Platform of Bhutan Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 636K USD | Direct Selection |
| 15 ottobre 2026 | PRICEWATERHOUSECOOPERS PVT. LTD, INDIA (PWCPL, INDIA) (India) | Selection of Consultant for Multimodal Transport and Trade Logistics Assessment, Formulation of Masterplan(s) and Supporting Capacity Development Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 1,2 Mln USD | Quality And Cost-Based Selection |
| 15 ottobre 2026 | TRAINING AND TECHNOLOGY TRANSFER LTD. (TTT LTD) (Nuova Zelanda) | Selection of Consultant for Multimodal Transport and Trade Logistics Assessment, Formulation of Masterplan(s) and Supporting Capacity Development Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 1,2 Mln USD | Quality And Cost-Based Selection |
| 28 settembre 2026 | SAI TRADING | Supply of Road Safety Enforcement Equipment Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 120K USD | Request for Bids |
| 27 agosto 2026 | INDIVIDUAL CONSULTANT | Selection of National Procurement Specialist for PMU-DoST Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 24,3K USD | Individual Consultant Selection |
| 25 agosto 2026 | SITHUNG ENTERPRISE | Animal identification via eGP Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 4,62K USD | Request for Quotations |
| 10 agosto 2026 | KARMA TSHONGKHANG | Animal identification via eGP Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 2,33K USD | Request for Quotations |
| 6 agosto 2026 | M/S DRUK WANGMO SUPPLIER | Animal identification via eGP Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 16,3K USD | Request for Quotations |
| 28 luglio 2026 | BHUTAN TRADERS | Supply and Delivery of Current Meters Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 78,6K USD | Request for Bids |
| 25 giugno 2026 | INDIVIDUAL CONSULTANT (Canada) | Selection of Individual Consultant for the FIDIC Training to DOST Engineers Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 17,4K USD | Individual Consultant Selection |
| 19 giugno 2026 | INDIVIDUAL CONSULTANT (Emirati Arabi Uniti) | Selection of Individual Bridge and Structural Specialist The contract amount reflected here is for only one year as the estimated cost in PP is indicated one ye Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 34,6K USD | Individual Consultant Selection |
| 18 giugno 2026 | NGN TECHNOLOGIES PRIVATE LIMITED | Supply of printer Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 6,66K USD | Request for Quotations |
| 15 giugno 2026 | INDIVIDUAL CONSULTANT (India) | Selection of International Procurement Expert Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 137K USD | Individual Consultant Selection |
| 12 giugno 2026 | BHUTAN NDI LIMITED | ENHANCEMENT OF NATIONAL DIGITAL IDENTITY (NDI) SYSTEM FOR BHUTAN NATIONAL SINGLE WINDOW (BNSW) TRADER AUTHENTICATION Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 835K USD | Direct Selection |
| 12 giugno 2026 | DRUK HORTICULTURE PRIVATE LIMITED | The procurement was carried out via eGP ( Refer Tender ID #25862) Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 4,36K USD | Request for Quotations |
| 11 giugno 2026 | B.D COMMERCIAL | The evaluation was carried out in eGP system as the procurement was below USD 30,000.00 Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 7,44K USD | Request for Quotations |
| 10 giugno 2026 | ISPOT | Procurement of computer accessories Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 4,21K USD | Request for Quotations |
| 29 maggio 2026 | PIETRANGELI SAFE SRL (Italia) | Consultancy Services for Design and Engineering Consultant for 1125 MW Dorjilung Hydroelectric Power Project Dorjilung Hydroelectric Power Project ↗ | 3,68 Mln USD | Quality Based Selection |
| 29 maggio 2026 | SMEC INDIA PRIVATE LIMITED (India) | Consultancy Services for Design and Engineering Consultant for 1125 MW Dorjilung Hydroelectric Power Project Dorjilung Hydroelectric Power Project ↗ | 3,68 Mln USD | Quality Based Selection |
| 28 maggio 2026 | BHUTAN A2Z STATISTICS, ECONOMICS AND ENVIRONMENTAL CONSULTANCY | Baseline Survey Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 43,9K USD | Consultant Qualification Selection |
| 26 maggio 2026 | BHUTAN ECOLOGICAL SOCIETY | Consultant to explore and prepare the process for forest certification Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 354K USD | Direct Selection |
| 22 maggio 2026 | KARMA PENJORE | Consultant to assess effectiveness of citrus ordinance and study strategic way forward Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 8,61K USD | Direct Selection |
| 22 maggio 2026 | INDIVIDUAL CONSULTANT | SIC for assessment of argiculture extension Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 26,3K USD | Individual Consultant Selection |
| 21 maggio 2026 | OLI ENTERPRISE | Oli Enterprise for supply of tools and equipment FY 25-28 Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 109K USD | Request for Bids |
| 18 maggio 2026 | KG TRADINGS | KG Trading for supply of tools and equipment FY 25-28 Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 39,9K USD | Request for Bids |
| 15 maggio 2026 | NGN TECHNOLOGY PVT. LTD. | Video conferencing equipment Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 9,61K USD | Request for Bids |
| 13 maggio 2026 | DHA CHZEN MOTORS | Procurement of 2 utility vechiles with cold chain facility Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 73,9K USD | Direct Selection |
| 13 maggio 2026 | SHERUB ENTERPRISE | Sherub Enterprise for supply of tools and equipment FY 25-28 Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 6,21K USD | Request for Bids |
| 12 maggio 2026 | C. WANGCHUK CONSTRUCTION | Construction of internal access road, gates and sinage at NDDC, DoL Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 118K USD | Request for Bids |
| 12 maggio 2026 | DRAGON CORDERS PRIVATE LIMITED | Development of Bhutan BiosecurityAssessment System (BBAS) for BFDA Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 15,7K USD | Direct Selection |
| 8 maggio 2026 | KR ENTERPRISE | Procurement of furniture based on MoAL Framework contract Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 127 USD | Direct Selection |
| 7 maggio 2026 | NATIONAL SEED CENTRE | Procurement of seedlings and fertilizer for enhancement of citrus production, Evaluation of Yield Performance and Feasibility and develop and promote model pota Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 89,8K USD | Direct Selection |
| 6 maggio 2026 | PALDEN PHUNTSHOK(P.P) TRADERS | Procurement of vermiculate based on NCoA framework contract Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 7,99K USD | Direct Selection |
| 3 maggio 2026 | INDIVIDUAL CONSULTANT | SIC for AV consultant Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 3,06K USD | Individual Consultant Selection |
| 27 aprile 2026 | C. WANGCHUK CONSTRUCTION | Construction of two propagation house for citrus rootstock at Tashiyangtse, Bhutan Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 274K USD | Request for Bids |
| 23 aprile 2026 | THIMPHU TECHPARK LIMITED ( TTPL) | Hiring of a Training Institute to provide In-country training under the ACCESS Project Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 102K USD | Direct Selection |
| 23 aprile 2026 | HYDROPOWER SUSTAINABILITY ALLIANCE ASSOCIATION (Portogallo) | Selection of Consultant for conducting Accredited Assessor Training on Hydropower Sustainability Standard by HSA Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 48,6K USD | Direct Selection |
| 23 aprile 2026 | TOBGAY TOBGAY CONSULTANCY | Selection of Non-consulting service for carrying out lineament mapping for Chamkharchhu II & Chamkharchhu IV Hydropower Projects Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 21,3K USD | Request for Bids |
| 17 aprile 2026 | INDIVIDUAL CONSULTANT | Hiring of National Individual Gender/GBV Specialist Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 10,4K USD | Individual Consultant Selection |
| 17 aprile 2026 | ISPOT | Procurement of Laptops for new recruits under ACCESS Project Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 17,2K USD | Direct Selection |
| 16 aprile 2026 | SCD ENTERPRISE | Supply of Global Mapper Pro- License- Node Locked Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 2,19K USD | Direct Selection |
| 14 aprile 2026 | KHEYCHOK GEO INFOSYS | Topographical Survey & Mapping for Chamkharchhu II Hydropower Project, Zhemgang Dzongkhag and Chamkharchhu IV Hydropower Project, Bumthang Dzongkhag Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 189K USD | Request for Bids |
| 13 aprile 2026 | JSR-MK TRADING COMPANY | Supply of Geophysical Accessories: Earthing Tester Equipment- MeggerDET4TCR2 (rechargeable) Earth Tester along with Earth Test Kits (ETK) Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 6K USD | Direct Selection |
| 13 aprile 2026 | GUIDELINE GEO (Svezia) | Supply of Geophysical Accessories: 1.Electrical Resistivity Imaging (ERI) Cable and Accessories and 2. Seismic Refraction Tomography (SRT) Cable and Accessories Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 43,3K USD | Direct Selection |
| 31 marzo 2026 | PD TRADER | Milk equipment Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 5,21K USD | Request for Quotations |
| 31 marzo 2026 | KARMA ONE STOP SHOP THIMPHU/KARMA PHARMACEUTICALS AND MEDICAL SUPPLIES | Milk equipment Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 3,78K USD | Request for Quotations |
| 30 marzo 2026 | DRASINDRA TECHNOLOGY PTL | Supply of multi-function heavy duty printer for PMU Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 1,26K USD | Request for Quotations |
| 23 marzo 2026 | SINGYE AGENCIES | For the supply of two boleros to transport liquid nitrogen for animal to nation wide, DoL Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 17,1K USD | Direct Selection |
| 23 marzo 2026 | GEOGIGA TECHNOLOGY CORP. (Canada) | Supply of Seismic Pro software Package with dongles: 1. Refractor (1 no.) 2. DW TOMO (1 no.) 3. Seismapper (1no.) Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 9,48K USD | Direct Selection |
| 18 marzo 2026 | U-TECH FURNITURE AND INTERIORS | Procurement of Furniture based on MoAL framework contract Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 1,08K USD | Direct Selection |
| 11 marzo 2026 | IBEST STUDIOS | Selection of Consultant for the Production of Road Safety Awareness Videos Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 23,3K USD | Consultant Qualification Selection |
| 25 febbraio 2026 | INDIVIDUAL CONSULTANT (Sri Lanka) | Selection of an international individual Data Center expert consultant Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 134K USD | Individual Consultant Selection |
| 27 gennaio 2026 | INDIVIDUAL CONSULTANT (Stati Uniti) | Hiring of a technical consultant for the establishment of the wood lab at UWIFoRT Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 100 USD | Individual Consultant Selection |
| 27 gennaio 2026 | INDIVIDUAL CONSULTANT (Thailandia) | Direct selection of Technical expert. No professional fee and only logistic to be borne by DoFPS Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains ↗ | 0 USD | Individual Consultant Selection |
| 7 gennaio 2026 | CONSULTING ENGINEERS GROUP LIMITED (India) | Hiring of Consultancy Services for Detailed Design and Construction Supervision of road and bridges for Gelephu-Tareythang, Sarpang, Bhutan Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 2,86 Mln USD | Quality And Cost-Based Selection |
| 7 gennaio 2026 | DOHWA ENGINEERING CO., LTD (DOHWA) (Corea del Sud) | Hiring of Consultancy Services for Detailed Design and Construction Supervision of road and bridges for Gelephu-Tareythang, Sarpang, Bhutan Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 2,86 Mln USD | Quality And Cost-Based Selection |
| 5 gennaio 2026 | MIR MEHBUBUR RAHMAN (Bangladesh) | Selection of International Procurement Consultant Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 70,1K USD | Direct Selection |
| 1 gennaio 2026 | FARM MACHINERY CORPORATION LIMITED | Only one firm (Farm Machinery Corporation Limited) since its direct Selection. Contract is signed for 1 full months, but machines will be kept off during Sunday Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 2,03K USD | Direct Selection |
| 20 dicembre 2025 | VENKATA SUBBARA NUKALA (Canada) | Contract Agreement for Environment and Social Consultant Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 34,9K USD | Direct Selection |
| 18 dicembre 2025 | MIDAS RESEARCH AND DEVELOPMENT CENTRE INDIA PRIVATE LIMITED (India) | Supply of three (03) numbers of MIDAS CIM Software license Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project ↗ | 26K USD | Direct Selection |
Contract award prices in Bhutan
The median is the middle amount: half of the contracts are below it, half above. The range goes from the cheapest quarter to the most expensive quarter.
| Type of contract | Contracts | Median | Usual range | Largest contract |
|---|---|---|---|---|
| Goods | 173 | 7,18K USD | 2,18K USD – 20,1K USD | 835K USD |
| Works | 14 | 23,3K USD | 13,9K USD – 31,3K USD | 274K USD |
| Consulting services | 76 | 47,3K USD | 17,4K USD – 98,4K USD | 3,68 Mln USD |
These amounts cover contracts of very different sizes: compare your price with contracts of the same nature and size, and with the project budget if it is published.
Progetti finanziati: in preparazione e in corso
I progetti in preparazione pubblicheranno le loro gare nei prossimi mesi. Registratevi come fornitori presso l'ente beneficiario e seguite i suoi avvisi.
Vedere le gare 5 Fornitori e prestatori in Bhutan → Tutti i paesi
Fonte: Banca Mondiale, Contract Awards in Investment Project Financing e API dei progetti, licenza CC BY 4.0. Aggiornato: 17 novembre 2026. Importi in dollari USA.