254 contratti, 455 Mln USD, 175 imprese diverse. Il 96 % del valore è andato a imprese del paese.
Imprese che vincono di più
| Impresa | Paese d'origine | Contratti | Valore | Categoria principale |
|---|---|---|---|---|
| CENTRAL CONSTRUCTION JOINT STOCK COMPANY | Vietnam | 3 | 38,6 Mln USD | Works |
| VIETNAM CONSTRUCTION AND IMPORT-EXPORT JOINT STOCK CORPORATION | Vietnam | 2 | 36,7 Mln USD | Works |
| COTECCONS CONSTRUCTION JOINT STOCK COMPANY | Vietnam | 1 | 18,4 Mln USD | Works |
| CÔNG TY CỔ PHẦN XÂY DỰNG HẠ TẦNG BẮC TRUNG NAM | Vietnam | 2 | 17,6 Mln USD | Works |
| TAN THANH COMPANY LTD. | Vietnam | 3 | 16 Mln USD | Works |
| VIET NAM CONSTRUCTION AND IMPORT EXPORT JOINT STOCK CORPORATION | Vietnam | 2 | 15,2 Mln USD | Works |
| VIET NAM CONSTRUCTION JOINT STOCK COMPANY NO 12 | Vietnam | 2 | 15,2 Mln USD | Works |
| CJSC5 | null | 1 | 14,7 Mln USD | Works |
| 510 ENGINEERING CONST. J/STOCK CO. | Vietnam | 2 | 12,4 Mln USD | Works |
| TỔNG CÔNG TY XÂY DỰNG NÔNG NGHIỆP VIỆT NAM - CÔNG TY CỔ PHẦN | Vietnam | 1 | 12,3 Mln USD | Works |
| 36 CORPORATION | Vietnam | 1 | 12,1 Mln USD | Works |
| TUAN HIEN COMPANY LIMITED | Vietnam | 1 | 11,5 Mln USD | Works |
| HANOI CONSTRUCTION JOINT STOCK COMPANY NO. 1 | Vietnam | 1 | 11,2 Mln USD | Works |
| THANG LONG CONSTRUCTION COMPANY LIMITED | Vietnam | 2 | 10,5 Mln USD | Works |
| HOCHIMINH MUSEUM CONSTRUCTION JOINT STOCK COMPANY | Vietnam | 1 | 9,89 Mln USD | Works |
Contratti aggiudicati di recente
| Data | Impresa | Oggetto | Valore | Procedura |
|---|---|---|---|---|
| 21 settembre 2026 | CINEMA-BROADCAST JOINT STOCK COMPANY | HCMVNU-G-09.1: Supply and Installation of Equipment for the Central Analytical Laboratory of the Research Institute Vietnam University Development of VNU-Hanoi, VNU-HCM, and UD ↗ | 4,57 Mln USD | Request for Bids |
| 16 settembre 2026 | MINH QUANG COMPANY LIMITED | Package CW2.2 - Construction of Hung Hoa 2 retention lake Nghe An Province's Vinh City Priority Infrastructure and Urban Resilience Development Project ↗ | 3,34 Mln USD | Request for Bids |
| 16 settembre 2026 | TAY AN JOINT STOCK COMPANY | Package CW2.2 - Construction of Hung Hoa 2 retention lake Nghe An Province's Vinh City Priority Infrastructure and Urban Resilience Development Project ↗ | 3,34 Mln USD | Request for Bids |
| 16 settembre 2026 | RURAL CONSTRUCTION AND DEVELOPMENT JOINT STOCK COMPANY NO. 10 | Package CW2.2 - Construction of Hung Hoa 2 retention lake Nghe An Province's Vinh City Priority Infrastructure and Urban Resilience Development Project ↗ | 3,34 Mln USD | Request for Bids |
| 12 settembre 2026 | CONSTRUCTION AND ENVIRONMENTAL ENGINEERING JSC | BDCS-04: Construction Supervision and Contract Management Binh Duong Province's Water Environment Improvement Project ↗ | 2,27 Mln USD | Quality And Cost-Based Selection |
| 12 settembre 2026 | BERIM SA (Francia) | BDCS-04: Construction Supervision and Contract Management Binh Duong Province's Water Environment Improvement Project ↗ | 2,27 Mln USD | Quality And Cost-Based Selection |
| 12 settembre 2026 | DUC NHI CONSTRUCTION JOINT STOCK COMPANY | QN-WB-02 / Construction of Hung My Bridge over Truong Giang River Integrated Resilient Development Project ↗ | 2,73 Mln USD | Request for Bids |
| 12 settembre 2026 | DELTA CONSTRUCTION AND TRADING JOINT STOCK COMPANY | QN-WB-02 / Construction of Hung My Bridge over Truong Giang River Integrated Resilient Development Project ↗ | 2,73 Mln USD | Request for Bids |
| 26 agosto 2026 | EPRO CONSULTING JOINT STOCK COMPANY (EPRO) | Review and update for current Energy Efficiency Benchmarking for 2 Sub- Industrial sectors, develop new EE&EC standards for 2 sub-industries and technical guide Vietnam Scaling Up Energy Efficiency Project ↗ | 46K USD | Direct Selection |
| 26 agosto 2026 | ENERGY CONSERVATION RESEARCH AND DEVELOPMENT CENTER (ENERTEAM), | Review and update for current Energy Efficiency Benchmarking for 2 Sub- Industrial sectors, develop new EE&EC standards for 2 sub-industries and technical guide Vietnam Scaling Up Energy Efficiency Project ↗ | 46K USD | Direct Selection |
| 25 agosto 2026 | EPRO CONSULTING JOINT STOCK COMPANY | Finalize VNEEF (Vietnam National Energy Efficiecny Fund) model Vietnam Scaling Up Energy Efficiency Project ↗ | 129K USD | Consultant Qualification Selection |
| 20 agosto 2026 | INDIVIDUAL CONSULTANT | Contract for Procurement Consultant Sustainable Management of Substances Controlled by the Montreal Protocol ↗ | 152K USD | Individual Consultant Selection |
| 20 agosto 2026 | DACINCO CONSTRUCTION INVESTMENT LIMITED COMPANY | QN-WB-03: Construction of Binh Nam Bridge over Truong Giang Integrated Resilient Development Project ↗ | 5,84 Mln USD | Request for Bids |
| 19 agosto 2026 | CJSC5 | BDCW-01: Upgrading the capacity of Thuan An Wastewater Treatment Plant with an additional capacity of 20,000 m3/day Binh Duong Province's Water Environment Improvement Project ↗ | 14,7 Mln USD | Request for Bids |
| 14 agosto 2026 | ENVIRONMENT AND ECOLOGY INSTITUTE (EEI) | Providing technical support, training, and communication on energy efficiency for industrial zones and clusters in Vietnam Vietnam Scaling Up Energy Efficiency Project ↗ | 183K USD | Consultant Qualification Selection |
| 3 agosto 2026 | VIETNAM TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY (VETS) | Develop/Upgrade MRV Systems for Selected Industrial Sectors Vietnam Scaling Up Energy Efficiency Project ↗ | 167K USD | Consultant Qualification Selection |
| 28 luglio 2026 | INDIVIDUAL CONSULTANT | Contract for Accountant Consultant Sustainable Management of Substances Controlled by the Montreal Protocol ↗ | 103K USD | Individual Consultant Selection |
| 22 luglio 2026 | TUV NORD VIETNAM COMPANY LIMITED | Support the development of energy management systems and capacity building Vietnam Scaling Up Energy Efficiency Project ↗ | 123K USD | Consultant Qualification Selection |
| 22 luglio 2026 | PROFM VIETNAM COMPANY LIMITED | Support the development of energy management systems and capacity building Vietnam Scaling Up Energy Efficiency Project ↗ | 123K USD | Consultant Qualification Selection |
| 20 luglio 2026 | INDIVIDUAL CONSULTANT | Contract for Administration and Communication Consultant Sustainable Management of Substances Controlled by the Montreal Protocol ↗ | 110K USD | Individual Consultant Selection |
| 20 luglio 2026 | INDIVIDUAL CONSULTANT | Contract for Financial Management Consultant Sustainable Management of Substances Controlled by the Montreal Protocol ↗ | 192K USD | Individual Consultant Selection |
| 20 luglio 2026 | INDIVIDUAL CONSULTANT | Contract for Monitoring and Evaluation Consultant Sustainable Management of Substances Controlled by the Montreal Protocol ↗ | 110K USD | Individual Consultant Selection |
| 15 luglio 2026 | HẬU THỊ MỸ | Translating materials into Mông ethnic minority language include Vietnam: Improved Delivery of Legal Aid for the Poor And Vulnerable ↗ | 3,03K USD | Direct Selection |
| 15 luglio 2026 | TRIỆU THẾ THUẬN | Translating materials into Mong Vietnam: Improved Delivery of Legal Aid for the Poor And Vulnerable ↗ | 3,03K USD | Direct Selection |
| 15 luglio 2026 | NEANG NA RI PAU | Translating materials into Khmer Vietnam: Improved Delivery of Legal Aid for the Poor And Vulnerable ↗ | 3,03K USD | Direct Selection |
| 15 luglio 2026 | CA THỊ HỒNG MINH | Translating materials into Thai Vietnam: Improved Delivery of Legal Aid for the Poor And Vulnerable ↗ | 2,7K USD | Direct Selection |
| 15 luglio 2026 | TRIỆU THỊ HIỀN | Translating materials into Dao Vietnam: Improved Delivery of Legal Aid for the Poor And Vulnerable ↗ | 3,03K USD | Direct Selection |
| 8 luglio 2026 | CENTRE FOR ENERGY AND GREEN GROWTH RESEARCH (CEGR) | Develop tools for analyzing the energy efficiency of sub-projects and assess the current state of the market for energy-saving investment loans Vietnam Scaling Up Energy Efficiency Project ↗ | 61,8K USD | Consultant Qualification Selection |
| 8 luglio 2026 | GREEN DEVELOPMENT CENTRE (GREEN DC) | Develop tools for analyzing the energy efficiency of sub-projects and assess the current state of the market for energy-saving investment loans Vietnam Scaling Up Energy Efficiency Project ↗ | 61,8K USD | Consultant Qualification Selection |
| 8 luglio 2026 | INDIVIDUAL CONSULTANT | Contract for Coordinator Consultant Sustainable Management of Substances Controlled by the Montreal Protocol ↗ | 192K USD | Individual Consultant Selection |
| 2 luglio 2026 | HOA HIEP COMPANY LIMITED | Package CW2.3 - Construction of the Hoi Chua Pumping Station Nghe An Province's Vinh City Priority Infrastructure and Urban Resilience Development Project ↗ | 7,62 Mln USD | Request for Bids |
| 2 luglio 2026 | PETROVIETNAM CONSTRUCTION JOINT STOCK CORPORATION | Package CW2.3 - Construction of the Hoi Chua Pumping Station Nghe An Province's Vinh City Priority Infrastructure and Urban Resilience Development Project ↗ | 7,62 Mln USD | Request for Bids |
| 18 giugno 2026 | CONG TY TNHH NHAT MINH | BD-CW02-2 The road section from National Highway 19C connecting Quy Nhon Port - Section 2: Km1+159.97 - Km4+202.86 Integrated Resilient Development Project ↗ | 4,95 Mln USD | Request for Bids |
| 18 giugno 2026 | CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG NỀN MÓNG PHÚ SỸ | BD-CW02-2 The road section from National Highway 19C connecting Quy Nhon Port - Section 2: Km1+159.97 - Km4+202.86 Integrated Resilient Development Project ↗ | 4,95 Mln USD | Request for Bids |
| 18 giugno 2026 | CÔNG TY CỔ PHẦN XÂY DỰNG HẠ TẦNG BẮC TRUNG NAM | BD-CW02-2 The road section from National Highway 19C connecting Quy Nhon Port - Section 2: Km1+159.97 - Km4+202.86 Integrated Resilient Development Project ↗ | 4,95 Mln USD | Request for Bids |
| 15 giugno 2026 | LÊ THỊ KIM DUNG | Recuitment of consultants to review, update, and finalize materials developed under Components 1 Vietnam: Improved Delivery of Legal Aid for the Poor And Vulnerable ↗ | 3,67K USD | Direct Selection |
| 15 giugno 2026 | KIỀU THỊ THÙY LINH | Recuitment of consultant to review, update, and finalize materials developed under Component 2 Vietnam: Improved Delivery of Legal Aid for the Poor And Vulnerable ↗ | 3,67K USD | Direct Selection |
| 15 giugno 2026 | NGUYỄN THỊ MINH | Recuitment of consultant to review, update, and finalize materials developed under Component 3 Vietnam: Improved Delivery of Legal Aid for the Poor And Vulnerable ↗ | 3,67K USD | Direct Selection |
| 2 giugno 2026 | 575 CONSTRUCTION INSTALLATION AND INVESTMENT JOINT STOCK COMPANY | Package CW1.3: Construction of Cao Xuan Huy Extension Road Nghe An Province's Vinh City Priority Infrastructure and Urban Resilience Development Project ↗ | 1,9 Mln USD | Request for Bids |
| 2 giugno 2026 | THANH CONG CONSTRUCTION CONSULTANCY COMPANY LIMITED | Package CW1.3: Construction of Cao Xuan Huy Extension Road Nghe An Province's Vinh City Priority Infrastructure and Urban Resilience Development Project ↗ | 1,9 Mln USD | Request for Bids |
| 29 maggio 2026 | CÔNG TY TNHH THƯƠNG MẠI VẬT TƯ KHOA HỌC KỸ THUẬT | HCMVNU-G-08.07-2: Supply and installation of equipment for upgrading laboratories at UHS and AGU Vietnam University Development of VNU-Hanoi, VNU-HCM, and UD ↗ | 1,95 Mln USD | Request for Bids |
| 26 maggio 2026 | TAN THANH COMPANY LTD. | The coastal road section from My Thanh to Lai Giang - Section 2: Km72+347.20 - Km83+098.39 Integrated Resilient Development Project ↗ | 5,6 Mln USD | Request for Bids |
| 22 maggio 2026 | CÔNG TY TNHH GIẤY VỞ HỒNG ĐIỆP | Package RFQ-32 (Activity 1.5.3.1): Leaflets/ materials on hotlines and mobile legal aid application Vietnam: Improved Delivery of Legal Aid for the Poor And Vulnerable ↗ | 6,42K USD | Request for Quotations |
| 28 aprile 2026 | CÔNG TY CP IN SÁCH & XÂY DỰNG CAO MINH | Package RFQ-36 (Activity 2.1.4.1) Printing and distributing the Legal Aid Handbook Vietnam: Improved Delivery of Legal Aid for the Poor And Vulnerable ↗ | 5,93K USD | Request for Quotations |
| 28 aprile 2026 | INDIVIDUAL CONSULTANT (Danimarca) | Package ICS-24: Activity 2.5.1.2. Hiring an international consultant to develop a report on best practices and experiences in successful legal aid cases and ski Vietnam: Improved Delivery of Legal Aid for the Poor And Vulnerable ↗ | 6,67K USD | Individual Consultant Selection |
| 22 aprile 2026 | CÔNG TY CỔ PHẦN XÂY DỰNG HẠ TẦNG BẮC TRUNG NAM | The coastal road section from My Thanh to Lai Giang - Section 1: Km45+00 - Km57+00 Integrated Resilient Development Project ↗ | 12,7 Mln USD | Request for Bids |
| 20 aprile 2026 | 510 ENGINEERING CONST. J/STOCK CO. | QN-WB-01 / Construction of Binh Duong Bridge over Truong Giang River Integrated Resilient Development Project ↗ | 4,01 Mln USD | Request for Bids |
| 15 aprile 2026 | TAN THANH COMPANY LTD. | The coastal road section from My Thanh to Lai Giang - Section 1: Km57+00 - Km72+347.20 Integrated Resilient Development Project ↗ | 7,39 Mln USD | Request for Bids |
| 15 aprile 2026 | CONG TY CO PHAN DAU TU VA XAY DUNG 703 | The coastal road section from My Thanh to Lai Giang - Section 1: Km57+00 - Km72+347.20 Integrated Resilient Development Project ↗ | 7,39 Mln USD | Request for Bids |
| 13 aprile 2026 | DILIP R. LIMAYE (Stati Uniti) | Project International Advisor Vietnam Scaling Up Energy Efficiency Project ↗ | 102K USD | Direct Selection |
| 13 aprile 2026 | THANG LONG MECHANICAL CONSTRUCTION JOINT STOCK CORPORATION | QN-WB-04 / Construction of Tinh Thuy Bridge over Truong Giang River Integrated Resilient Development Project ↗ | 2,82 Mln USD | Request for Bids |
| 13 aprile 2026 | THANG LONG CONSTRUCTION JSC NO.16 | QN-WB-04 / Construction of Tinh Thuy Bridge over Truong Giang River Integrated Resilient Development Project ↗ | 2,82 Mln USD | Request for Bids |
| 10 aprile 2026 | TAN THANH COMPANY LTD. | The road section from National Highway 19C connecting Quy Nhon Port - Section 3: Km4+202.86 - Km6+353.03 Integrated Resilient Development Project ↗ | 3,05 Mln USD | Request for Bids |
| 10 aprile 2026 | CONG TY TNHH NHAT MINH | The road section from National Highway 19C connecting Quy Nhon Port - Section 3: Km4+202.86 - Km6+353.03 Integrated Resilient Development Project ↗ | 3,05 Mln USD | Request for Bids |
| 10 aprile 2026 | CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG NỀN MÓNG PHÚ SỸ | The road section from National Highway 19C connecting Quy Nhon Port - Section 3: Km4+202.86 - Km6+353.03 Integrated Resilient Development Project ↗ | 3,05 Mln USD | Request for Bids |
| 7 aprile 2026 | 510 ENGINEERING CONST. J/STOCK CO. | The road section from National Highway 19C connecting Quy Nhon Port - Section 1: Km0 - Km1+159.97 Integrated Resilient Development Project ↗ | 8,43 Mln USD | Request for Bids |
| 3 aprile 2026 | HOAN MY CONSTRUCT COMPANY LIMITED | Construction of Long Ho river embankment (ward 4 bank) Vinh Long City Urban Development and Enhanced Climate Resilience Project in Vinh Long Province ↗ | 2,93 Mln USD | Request for Bids |
| 3 aprile 2026 | HOANG GIANG TECHNICAL JOINT STOCK COMPANY | Construction of Long Ho river embankment (ward 4 bank) Vinh Long City Urban Development and Enhanced Climate Resilience Project in Vinh Long Province ↗ | 2,93 Mln USD | Request for Bids |
| 3 aprile 2026 | TAN DAI LONG INVESTMENT JOINT STOCK COMPANY | Construction of Long Ho river embankment (ward 4 bank) Vinh Long City Urban Development and Enhanced Climate Resilience Project in Vinh Long Province ↗ | 2,93 Mln USD | Request for Bids |
| 26 marzo 2026 | 36 CORPORATION | Construction and installation of equipment for the Administration Building (TN1); Laboratory center (TN2.1; TN2.2 & TN 2.3) and internal landscape, Center for E Vietnam University Development of VNU-Hanoi, VNU-HCM, and UD ↗ | 12,1 Mln USD | Request for Bids |
Contract award prices in Vietnam
The median is the middle amount: half of the contracts are below it, half above. The range goes from the cheapest quarter to the most expensive quarter.
| Type of contract | Contracts | Median | Usual range | Largest contract |
|---|---|---|---|---|
| Goods | 60 | 465K USD | 77,7K USD – 889K USD | 4,57 Mln USD |
| Works | 78 | 3,34 Mln USD | 2,32 Mln USD – 7,22 Mln USD | 18,6 Mln USD |
| Consulting services | 108 | 24,4K USD | 6,32K USD – 115K USD | 2,27 Mln USD |
| Other services | 8 | 6,9K USD | 3,69K USD – 21,3K USD | 58,5K USD |
These amounts cover contracts of very different sizes: compare your price with contracts of the same nature and size, and with the project budget if it is published.
Progetti finanziati: in preparazione e in corso
I progetti in preparazione pubblicheranno le loro gare nei prossimi mesi. Registratevi come fornitori presso l'ente beneficiario e seguite i suoi avvisi.
Vedere le gare 1 Fornitori e prestatori in Vietnam → Tutti i paesi
Fonte: Banca Mondiale, Contract Awards in Investment Project Financing e API dei progetti, licenza CC BY 4.0. Aggiornato: 17 novembre 2026. Importi in dollari USA.