352 contratos, 37,1 M US$, 169 empresas distintas. El 99 % del importe fue para empresas del país.
Las empresas que más han ganado
| Empresa | País de origen | Contratos | Importe | Categoría principal |
|---|---|---|---|---|
| KUNDUZ SHAMAL CONSTRUCTION AND ROAD BUILDING COMPANY | Afganistán | 15 | 3,47 M US$ | Works |
| BETTER FUTURE CONSTRUCTION AND ROAD BUILDING COMPANY | Afganistán | 11 | 2,12 M US$ | Works |
| SALAR PAHTOON CONSTRUCTION COMPANY | Afganistán | 16 | 1,41 M US$ | Works |
| ABDUL RAHIMZAI AFGHAN CONSTRUCTION AND ENGINEERING COMPANY | Afganistán | 6 | 1,34 M US$ | Works |
| TAKWIN CONSTRUCTION & ELECTRICAL ENGINEERING COMPANY | Afganistán | 5 | 1,01 M US$ | Works |
| BUILDS WICK CONSTRUCTION AND ROAD BUILDING COMPANY | Afganistán | 4 | 956 mil US$ | Works |
| SAMSOR AMIN CONSTRUCTION AND ENGINEERING COMPANY | Afganistán | 3 | 878 mil US$ | Works |
| SEFAT CONSTRUCTION COMPANY | Afganistán | 5 | 722 mil US$ | Works |
| MASS LOGISTIC & CONSTRUCTION COMPANY | Afganistán | 6 | 697 mil US$ | Works |
| CHAKABI CONSTRUCTION AND ROAD BUILDING LTD | Afganistán | 1 | 690 mil US$ | Works |
| ANWAR HAYATI CONSTRUCTION | Afganistán | 2 | 617 mil US$ | Works |
| QAIS NAZIR CONSTRUCTION ROAD BUILDING COMPANY | Afganistán | 5 | 593 mil US$ | Works |
| KAR ANDISH CONSTRUCTION COMPANY | Afganistán | 4 | 584 mil US$ | Works |
| ASR-E- NAWIN AFGHAN CONSTRUCTION COMPANY | Afganistán | 2 | 528 mil US$ | Works |
| MAKA CONSTRUCTION COMPANY | Afganistán | 3 | 524 mil US$ | Works |
Últimos contratos adjudicados
| Fecha | Empresa | Objeto | Importe | Método |
|---|---|---|---|---|
| 10 de septiembre de 2026 | KUNDUZ SHAMAL CONSTRUCTION AND ROAD BUILDING COMPANY | Construction of Pipe Scheme Project at Dasht-e-Layli Villages in Qusthtepa District Jawzjan Province Rebid-II Water Emergency Relief Project ↗ | 530 mil US$ | Request for Bids |
| 6 de septiembre de 2026 | SHAKAR LAB YAFTAL CONSTRUCTION, ROAD BUILDING COMPANY | Construction of Remaining works of Gravity -Fed Pipe Scheme in Dasht-e-Ping village in Arghanjkhaw district of Badakhshan province Ref No: WB/WERP/AKF/BAD/ARGHA Water Emergency Relief Project ↗ | 35 mil US$ | Direct Selection |
| 2 de septiembre de 2026 | LEMAR WAZIRI CONSTRUCTION | Construction of Gravity-Fed Pipe System in Bagh Darah village in Puli Hisar District and Bain Deh in Khinjan District of Baghlan Province Ref No.: WB/WERP/AKF/B Water Emergency Relief Project ↗ | 315 mil US$ | Request for Quotations |
| 13 de agosto de 2026 | ABDUL RAHIMZAI AFGHAN CONSTRUCTION AND ENGINEERING COMPANY | Construction of Ahmad Abad Village Solar Powered Pipe Scheme Project, Kohsan District, Herat Province under Ref: WB/WERP/DACAAR/HRT/KOH/AHMADA/W-136-DC Water Emergency Relief Project ↗ | 347 mil US$ | Direct Selection |
| 30 de junio de 2026 | UHY AFGHANISTAN - SHAFIQ UMAR DARAZ & CO. CHARTERED ACCOUNTANTS | Consultancy Services for External Audit Reference NO: AKF-A/EMERGE/CS-2 Empowering Microfinance and Enterprises for Resilience and Growth ↗ | 6 mil US$ | Consultant Qualification Selection |
| 29 de junio de 2026 | NEXIA GMBH (Alemania) | Draft negotiated lump-sum contract for External Audit (Component 1) – EMERGe Project (ACGF EMERGe C-23) – Nexia GmbH Empowering Microfinance and Enterprises for Resilience and Growth ↗ | 10,3 mil US$ | Direct Selection |
| 14 de mayo de 2026 | SHAHBAZ SARIR CONSTRUCTION AND ROAD BUILDING COMPANY | Construction of Pipe Scheme with a Solar pump system Naw-abad village in Saighan District of Bamyan Province Ref No: WB/WERP/AKF-A/BMN/SAIGHAN/NAWABAD/W-6 Rebid Water Emergency Relief Project ↗ | 74 mil US$ | Request for Quotations |
| 23 de abril de 2026 | EHYA WA EBDA CONSTRUCTION | Construction of Gravity -Fed Pipe Scheme (PSGS) in Dehan-e-Khawak village in Paryan District and in Laghana of Bazarak District and Debdia Village: WB/WERP/AKF/ Water Emergency Relief Project ↗ | 133 mil US$ | Request for Quotations |
| 13 de abril de 2026 | BROTHERS MOTAWAKIL COMPANY | Construction of Pipe Scheme with a Solar pump system in Bini Mang phase 1 village in Darah-e-Souf Bala District of Samangan Province Ref No: WB/WERP/AKF/SAM/DAR Water Emergency Relief Project ↗ | 54,8 mil US$ | Request for Quotations |
| 13 de abril de 2026 | TAKWIN CONSTRUCTION & ELECTRICAL ENGINEERING COMPANY | Procurement of the construction of Ahmad Abad Village Solar Powered Pipe Scheme Project, Kohsan District, Herat Province Identification Number:WB/WERP/DACAAR/HR Water Emergency Relief Project ↗ | 283 mil US$ | Request for Quotations |
| 13 de abril de 2026 | HEWAD MAHEER CONSTRUCTION AND ROAD-BUILDING COMPANY | 'Procurement of construction of Sharq Rod Khana Village Solar Powered Pipe Scheme Project, Gulran District, Herat Province Identification Number: WB/WERP/DACAAR Water Emergency Relief Project ↗ | 112 mil US$ | Request for Quotations |
| 6 de abril de 2026 | SERAT RADICAL LOGISTIC AND CONSTRUCTION SERVICES | Procurement of construction of Sayed Khel Village Solar Powered Pipe Scheme Project, Arghandab District, Zabul Province WB/WERP/DACAAR/ZBL/ARGHAND /SAYED/W-134 Water Emergency Relief Project ↗ | 112 mil US$ | Request for Quotations |
| 2 de abril de 2026 | STARRY CONSTRUCTION COMPANY | Procurement of construction of Solar Powered Pipe Scheme Project in Shekhan Ada and Sulaiman Khil villages in Mizan District in Zabul Province Water Emergency Relief Project ↗ | 162 mil US$ | Request for Quotations |
| 1 de abril de 2026 | MOHAMMAD SALEM IBRAHIM KHIL CONSTRUCTION AND ROAD BUILDING COMPANY | Construction of Pipe Scheme with Solar-Powered Slow Sand Filtration System in Patayar Village in Shortapa District of Balkh Province. Ref No: WB/WERP/AKF/BAL/SH Water Emergency Relief Project ↗ | 110 mil US$ | Request for Quotations |
| 1 de abril de 2026 | BALKH SABZ PESHGAM LOGISTICS SERVICES AND CONSTRUCTION CO | Construction of Pipe Scheme with Solar-Powered Slow Sand Filtration System in Patayar Village in Shortapa District of Balkh Province. Ref No: WB/WERP/AKF/BAL/SH Water Emergency Relief Project ↗ | 110 mil US$ | Request for Quotations |
| 1 de abril de 2026 | KHANMOHAMMAD WALI ZADA CONSTRUCTION COMPANY | Construction of Pipe Scheme with Solar-Powered Slow Sand Filtration System in Jairatan Village in Sharak-e-Hayratan District of Balkh Province Ref No: WB/WERP/A Water Emergency Relief Project ↗ | 154 mil US$ | Request for Quotations |
| 24 de marzo de 2026 | KAPISA KOHNA DEH CONSTRUCTION COMPANY | Construction of Pipe Scheme with a Solar pump system in Baghe Now village in Khinj District of Panjshir Province Ref No: WB/WERP/AKF/PANJ/KHINJ/BAGHENEOW/W-221 Water Emergency Relief Project ↗ | 38,6 mil US$ | Request for Quotations |
| 18 de marzo de 2026 | KOHBAND KAPISA CONSTRUCTION & ROAD BUILDING COMPANY | Procurement of construction of Omarzai Village Solar Powered Pipe Scheme Project, Koshamand District, Paktika Province Water Emergency Relief Project ↗ | 98 mil US$ | Request for Quotations |
| 18 de marzo de 2026 | AFGHANISTAN ALI BABA CONSTRUCTION & ENGINEERING | Procurement of construction of Ragha Village Solar Powered Pipe Scheme Project, Gomal District, Paktika Province Water Emergency Relief Project ↗ | 73,6 mil US$ | Request for Quotations |
| 18 de marzo de 2026 | AL IMRAN BISMILWALL CONSTRUCTION COMPANY | Procurement of Construction of Karato Boldak Village Solar Powered Pipe Scheme Project, Arghandab District, Zabul Province Identification Number: WB/WERP/DACAAR Water Emergency Relief Project ↗ | 79,7 mil US$ | Request for Quotations |
| 17 de marzo de 2026 | NEEKZAD WADAN CONSTRUCTION COMPANY | Procurement of Construction of Solar Powered Pipe Scheme Project in Baylogh, Mirzayan, Dawoodzai and Lodin Kali Villages in Day-e-Chopan District, Zabul Provinc Water Emergency Relief Project ↗ | 305 mil US$ | Request for Quotations |
| 17 de marzo de 2026 | MOHAMMAD KHALID CONSTRUCTION COMPANY | Procurement of construction of Rahman Kalay Village Solar Powered Pipe Scheme Project, Nawa District, Ghazni Province Water Emergency Relief Project ↗ | 86,2 mil US$ | Request for Quotations |
| 17 de marzo de 2026 | HEWAD MAHEER CONSTRUCTION AND ROAD-BUILDING COMPANY | Procurement of construction of Ali Sakht Bazar Village Solar Powered Pipe Scheme Project, Khak e Afghan District, Zabul Province Identification Number: WB/WERP/ Water Emergency Relief Project ↗ | 102 mil US$ | Request for Quotations |
| 17 de marzo de 2026 | BROTHERAN ESMATI GHORI CONSTRUCTION CO | Procurement of construction of Dasht e Mahal Samizai Village Solar Powered Pipe Scheme Project, Shindand District, Herat Province Identification Number: WB/WERP Water Emergency Relief Project ↗ | 87,9 mil US$ | Request for Quotations |
| 17 de marzo de 2026 | AL TAWAKAL ROAD AND CONSTRUCTION COMPANY | Procurement of construction of Shekhzada Village Solar Powered Pipe Scheme Project, Karokh District, Herat Province Water Emergency Relief Project ↗ | 72,7 mil US$ | Request for Quotations |
| 17 de marzo de 2026 | AFGHANISTAN ALI BABA CONSTRUCTION & ENGINEERING | Procurement of Construction Solar Powered Pipe Scheme Project in Mussa Khil Babo Khil and Zangi Khil villages in Gomal District, Paktika Province Identification Water Emergency Relief Project ↗ | 107 mil US$ | Request for Quotations |
| 17 de marzo de 2026 | AFGHANISTAN ALI BABA CONSTRUCTION & ENGINEERING | Procurement of construction of Chateri Village Solar Powered Pipe Scheme Project, Waza e Khwa District, Paktika Province Request for Quotation No: WB/WERP/DACAA Water Emergency Relief Project ↗ | 72,1 mil US$ | Request for Quotations |
| 17 de marzo de 2026 | BILAL HELAL CONSTRUCTION ROAD BUILDING & LOGISTIC COMPANY | Procurement of construction of Payen Deh Village Solar Powered Pipe Scheme Project, Jani Khel District, Paktika Province. Identification Number: WB/WERP/DACAAR/ Water Emergency Relief Project ↗ | 83,3 mil US$ | Request for Quotations |
| 16 de marzo de 2026 | HELAL HAQMAL CONSTRUCTION ROAD BUILDING COMPANY | Procurement of the construction of Takhom Potai Village Solar Powered Pipe Scheme Project, Mizan District, Zabul Province Identification Number: WB/WERP/DACAAR/ Water Emergency Relief Project ↗ | 80,1 mil US$ | Request for Quotations |
| 9 de marzo de 2026 | NAHID NEDA TRADING AND CONSTRUCTION COMPANY | Construction of Pipe Scheme with a Solar pump system in Ashoor Bic Khill village in Jabalusaraj District of Parwan Province, WB/WERP/AKF/PAR/JABALSARAJ/ASHOOR/W Water Emergency Relief Project ↗ | 42,9 mil US$ | Request for Quotations |
| 9 de marzo de 2026 | SALAHUDIN SODAIS CONSTRUCTION COMPANY | Construction of Pipe Scheme Project at Memlika Villages in Faizabad District Jawzjan Province Water Emergency Relief Project ↗ | 253 mil US$ | Request for Quotations |
| 8 de marzo de 2026 | SINA MUSADIQ CONSTRUCTION & LOGISTIC SERVICES COMPANY | Construction of Pipe Scheme with a Solar pump system in Amba-e-Seya Dara village in Doshi District in Baghlan province, Ref No: WB/WERP/AKF/BAG/DOSHI/AMBAYSYADA Water Emergency Relief Project ↗ | 25,5 mil US$ | Request for Quotations |
| 8 de marzo de 2026 | PARSA LANGARY ARCHITECTURE, CONSTRUCTION & ROAD BUILDING | Construction of Pipe Scheme with a Solar pump system in Amba-e-Seya Dara village in Doshi District in Baghlan province, Ref No: WB/WERP/AKF/BAG/DOSHI/AMBAYSYADA Water Emergency Relief Project ↗ | 25,5 mil US$ | Request for Quotations |
| 5 de marzo de 2026 | UNIQUE EXCLUSIVE CONSTRUCTION AND LOGISTIC SERVICES | Construction of Pipe Scheme with a Solar pump system in Langar Khana Khord village in Nahr-e-Shahi District of Balkh Province, Ref No: WB/WERP/AKF/BAL/NAHRSHAHI Water Emergency Relief Project ↗ | 79,9 mil US$ | Request for Quotations |
| 3 de marzo de 2026 | KHANMOHAMMAD WALI ZADA CONSTRUCTION COMPANY | Construction of Pipe Scheme with a Solar pump system in Qoshumsay village in Keshindah District of Balkh Province Ref No: WB/WERP/AKF/BAL/KESHENDEH/QUSHMSAY/W-2 Water Emergency Relief Project ↗ | 151 mil US$ | Request for Quotations |
| 3 de marzo de 2026 | BARADARANE YUSUF QASIMI CONSTRUCTION COMPANY | Construction of Pipe Scheme with a Solar pump system in Bini Mang Phase 2 and Sar-e-Shorab villages in Darah-e-Souf District in Samangan Province. Ref No: WB/WE Water Emergency Relief Project ↗ | 164 mil US$ | Request for Quotations |
| 3 de marzo de 2026 | STARRY CONSTRUCTION COMPANY | Procurement of construction of Zangali Loi Kali Village Solar Powered Pipe Scheme Project, Khak-e-Afghan District, Zabul Province Water Emergency Relief Project ↗ | 101 mil US$ | Request for Quotations |
| 26 de febrero de 2026 | SEDDIQ AMINI CONSTRUCTION AND LOGISTIC SERVICES COMPANY | Construction of Pipe Scheme with a Solar pump system in Nawabad village in Unaba District of Panjshir Province. Ref No: WB/WERP/AKF/PANJ/UNABA/NAWABAD/W-215 Water Emergency Relief Project ↗ | 68,7 mil US$ | Request for Quotations |
| 26 de febrero de 2026 | BUILDS WICK CONSTRUCTION AND ROAD BUILDING COMPANY | Procurement of construction of Manarai Village Solar Powered Pipe Scheme Project, Koshamand District, Paktika Province Identification Number: WB/WERP/DACAAR/PKT Water Emergency Relief Project ↗ | 115 mil US$ | Request for Quotations |
| 26 de febrero de 2026 | AL TAWAKAL ROAD AND CONSTRUCTION COMPANY | Procurement of Construction of Anjirak Village Solar-Powered Pipe Scheme Project, Karukh District, Herat Province Request for Quotation No: WB/WERP/DACAAR/HRT/K Water Emergency Relief Project ↗ | 100 mil US$ | Request for Quotations |
| 23 de febrero de 2026 | AFGHANISTAN ALI BABA CONSTRUCTION & ENGINEERING | Procurement of construction of Kunda Khel Village Solar Powered Pipe Scheme Project, Shakeen District, Paktika Province Identification Number: WB/WERP/DACAAR/PK Water Emergency Relief Project ↗ | 52,2 mil US$ | Request for Quotations |
| 23 de febrero de 2026 | BUILDS WICK CONSTRUCTION AND ROAD BUILDING COMPANY | Procurement of construction of Mohammad Khel Village Solar Powered Pipe Scheme Project, Nawa District, Ghazni Province Request for Quotation No: WB/WERP/DACAAR/ Water Emergency Relief Project ↗ | 178 mil US$ | Request for Quotations |
| 19 de febrero de 2026 | HELAL HAQMAL CONSTRUCTION ROAD BUILDING COMPANY | Procurement of construction of Solar Powered Pipe Scheme Project, in Alizai Kaga and Barimi villages in Charbaran District in Paktika Province Identification Nu Water Emergency Relief Project ↗ | 127 mil US$ | Request for Quotations |
| 18 de febrero de 2026 | SABZ JAWANAN CONSTRUCTION COMPANY | Construction of Pipe Scheme with a Solar pump system in Zeri Dara Goli village in Kahmard district of Bamyan Province Ref No.: WB/WERP/AKF/BAM/KAHMARD/ZERIDARAG Water Emergency Relief Project ↗ | 76,4 mil US$ | Request for Quotations |
| 16 de febrero de 2026 | PARSA BADAKHSHAN CONSTRUCTION AND ROAD BUILDING COMPANY | Construction of Gravity-Fed Pipe System in Bedikhwah village in Khahan District of Badakhshan Province. Ref No: WB/WERP/AKF/BAD/KHAHAN/BEDIKHWAH/W-196 Water Emergency Relief Project ↗ | 39,4 mil US$ | Request for Quotations |
| 16 de febrero de 2026 | MASS LOGISTIC & CONSTRUCTION COMPANY | Construction of Gravity-Fed Pipe System in Kaywan Phase 1 and 2 villages in Puli Hisar district Baghlan Province. Ref No: WB/WERP/AKF/BAG/PULH/KAYWAN1&2/W-212/2 Water Emergency Relief Project ↗ | 88,7 mil US$ | Request for Quotations |
| 16 de febrero de 2026 | HOTAK JAWADI CONSTRUCTION COMPANY | Procurement of the construction of Payenda Khel Village Solar Powered Pipe Scheme Project, Ab Band District, Ghazni Province Identification Number: WB/WERP/DACA Water Emergency Relief Project ↗ | 84,7 mil US$ | Request for Quotations |
| 16 de febrero de 2026 | SAMSOR AMIN CONSTRUCTION AND ENGINEERING COMPANY | Procurement of construction of Solar-Powered Pipe Scheme Project in Shinkowal, Braj, and Lasbandi villages in Wazakhwah District in Paktika Province Identificat Water Emergency Relief Project ↗ | 333 mil US$ | Request for Quotations |
| 12 de febrero de 2026 | SHAMAL NAZARI CONSTRUCTION AND ROAD BUILDING COMPANY | Construction of Gravity-Fed Pipe System in Wuch Sufla phase 1 & 2 in Khost District of Baghlan Province,WB/WERP/AKF/BAG/KHOST/WUCHS1&2/W-203/204 Water Emergency Relief Project ↗ | 112 mil US$ | Request for Quotations |
| 12 de febrero de 2026 | OMID PIROZKOH CONSTRUCTION CO. | Procurement of Construction of Bakhtabad Hussainzai Village Solar Powered Pipe Scheme Project, Shindand District, Herat Province Request for Quotation No:WB/WER Water Emergency Relief Project ↗ | 123 mil US$ | Request for Quotations |
| 11 de febrero de 2026 | AFGHANISTAN ALI BABA CONSTRUCTION & ENGINEERING | Procurement of Construction of Sher Guli Village Solar Powered Pipe Scheme Project, Gomal District, Paktika Province Identification Number: WB/WERP/DACAAR/PKT/G Water Emergency Relief Project ↗ | 79,4 mil US$ | Request for Quotations |
| 5 de febrero de 2026 | NAWAND NOOR CONSTRUCTION COMPANY | Construction of Pipe Scheme with a Solar pump system in Bland Arigh Ballah village in Zari District of Balkh Province. Ref No: WB/WERP/AKF/BAL/ZARI/BLANDARGHBAL Water Emergency Relief Project ↗ | 74 mil US$ | Request for Quotations |
| 4 de febrero de 2026 | MASS LOGISTIC & CONSTRUCTION COMPANY | Construction of Gravity-Fed Pipe System in Durnama and Boura & Zuria villages in Khinj Hesa-e-awal and Khinj District of Panjshir Province , Ref No: WB/WERP/AKF Water Emergency Relief Project ↗ | 151 mil US$ | Request for Quotations |
| 3 de febrero de 2026 | HAJI MOHAMMAD OSMANI CONSTRUCTION COMPANY | Construction of Pipe Scheme with a Solar pump system in Shulash Dara village in Namak Ab District in Takhar Province,WB/WERP/AKF/TAK/NAMAKAB/SHULASHDRA/W-202 Water Emergency Relief Project ↗ | 17,7 mil US$ | Request for Quotations |
| 3 de febrero de 2026 | BUILDS WICK CONSTRUCTION AND ROAD BUILDING COMPANY | Construction Solar Powered Pipe Scheme Projects in Lawang , Petab and Miryani Latif villages in Gelan District of Ghazni Province Request for Quotation No: WB/W Water Emergency Relief Project ↗ | 363 mil US$ | Request for Quotations |
| 3 de febrero de 2026 | QAIS NAZIR CONSTRUCTION ROAD BUILDING COMPANY | Procurement of Solar Powered Pipe Scheme Project, in Jalalzai 1 and 2 villages in Jani Khel District, Paktika Province Identification Number:: WB/WERP/DACAAR/PK Water Emergency Relief Project ↗ | 268 mil US$ | Request for Quotations |
| 3 de febrero de 2026 | SAMSOR AMIN CONSTRUCTION AND ENGINEERING COMPANY | Procurement of Construction of Solar Powered Pipe Scheme Project, in Mir Afzal and Sulaimanzai villages in Shakeen District, Paktika Province Ref No: WB/WERP/DA Water Emergency Relief Project ↗ | 155 mil US$ | Request for Quotations |
| 3 de febrero de 2026 | MATIN ARIA TRADING AND CONSTRUCTION COMPANY | Procurement of construction of Safari Khail - Qalandar Khail Village Solar Powered Pipe Scheme Project, Khugyani District, Ghazni Province Identification Number Water Emergency Relief Project ↗ | 84,6 mil US$ | Request for Quotations |
| 3 de febrero de 2026 | HOTAK JAWADI CONSTRUCTION COMPANY | Procurement of the construction of the Mulla Wasil Village Solar Powered Pipe Scheme Project, Khak-e-Afghan District, Zabul Province Identification Number: WB/W Water Emergency Relief Project ↗ | 72,1 mil US$ | Request for Quotations |
| 2 de febrero de 2026 | HELAL HAQMAL CONSTRUCTION ROAD BUILDING COMPANY | Procurement of construction of Haji Malook Village Solar Powered Pipe Scheme Project, Charbaran District, Paktika Province Identification Number: WB/WERP/DACAAR Water Emergency Relief Project ↗ | 64,7 mil US$ | Request for Quotations |
Precios de contratos adjudicados en Afganistán
La mediana es el importe central: la mitad de los contratos está por debajo y la otra mitad por encima. El rango va del cuarto más barato al cuarto más caro.
| Tipo de contrato | Contratos | Mediana | Rango habitual | Mayor contrato |
|---|---|---|---|---|
| Bienes | 43 | 8,95 mil US$ | 3,74 mil US$ – 26,9 mil US$ | 448 mil US$ |
| Obras | 297 | 91,1 mil US$ | 66,2 mil US$ – 137 mil US$ | 690 mil US$ |
| Servicios de consultoría | 6 | 32,2 mil US$ | 13,5 mil US$ – 94,1 mil US$ | 391 mil US$ |
| Otros servicios | 6 | 13,8 mil US$ | 3,56 mil US$ – 20,2 mil US$ | 157 mil US$ |
Estos importes abarcan contratos de tamaños muy distintos: compare su precio con contratos de la misma naturaleza y tamaño, y con el presupuesto del proyecto si está publicado.
Proyectos financiados: en preparación y activos
Los proyectos en preparación publicarán sus licitaciones en los próximos meses. Regístrese como proveedor ante el prestatario y siga sus avisos.
| Proyecto | Estado | Compromiso | Aprobación | Cierre | Sector |
|---|---|---|---|---|---|
| Additional Financing for the Afghanistan Community Resilience and Livelihoods Project ↗ | En preparación | 80 M US$ | |||
| Human Capital and Opportunities Enhancement Project (HOPE) ↗ | En preparación | – | |||
| Emergency Food Security Project ↗ | En preparación | – | |||
| Empowering Microfinance and Enterprises for Resilience and Growth ↗ | En preparación | – | |||
| AFGHANISTAN HEALTH EMERGENCY RESPONSE ↗ | En preparación | – | |||
| Afghanistan Sehatmandi Project ↗ | Activo | 600 M US$ | 28 de marzo de 2018 | 30 de junio de 2025 | Health |
| Afghanistan Health Emergency Response (HER) Project ↗ | Activo | 600 M US$ | 30 de septiembre de 2025 | Health | |
| Citizens' Charter Afghanistan Project ↗ | Activo | 544 M US$ | 27 de octubre de 2016 | 30 de junio de 2025 | Water Supply |
| COVID-19 Relief Effort for Afghan Communities and Households (REACH) ↗ | Activo | 280 M US$ | 4 de agosto de 2020 | 30 de junio de 2025 | Banking Institutions |
| EQRA ↗ | Activo | 273 M US$ | 28 de septiembre de 2018 | 30 de junio de 2025 | Secondary Education |
| Afghanistan Health Emergency Response (HER) Additional Financing ↗ | Activo | 267 M US$ | Health | ||
| Afghanistan Community Resilience and Livelihoods Project ↗ | Activo | 265 M US$ | 31 de diciembre de 2025 | Other Public Administration | |
| Trans-Hindukush Road Connectivity Project ↗ | Activo | 250 M US$ | 20 de octubre de 2015 | 30 de junio de 2025 | Rural and Inter-Urban Roads |
| Afghanistan Water, Sanitation, Hygiene and Institutional Support Project ↗ | Activo | 200 M US$ | 11 de diciembre de 2020 | 29 de enero de 2026 | Water Supply |
| Emergency Food Security Project ↗ | Activo | 195 M US$ | 30 de junio de 2025 | Crops | |
| Afghanistan: Eshteghal Zaiee - Karmondena (EZ-Kar) Project ↗ | Activo | 194 M US$ | 19 de diciembre de 2018 | 30 de junio de 2025 | Other Industry, Trade and Services |
| Second Additional Financing for Citizens' Charter Afghanistan Project ↗ | Activo | 193 M US$ | 11 de diciembre de 2020 | Other Education | |
| Citizens' Charter Afghanistan Project - Emergency Regional Displacement Response Additional Financing ↗ | Activo | 172 M US$ | 13 de junio de 2017 | Water Supply | |
| Additional Financing for the Afghanistan Community Resilience and Livelihoods Project ↗ | Activo | 154 M US$ | 30 de abril de 2024 | ||
| AF Irrigation Restoration and Development Project ↗ | Activo | 146 M US$ | 28 de abril de 2011 | 30 de junio de 2025 | Irrigation and Drainage |
| Additional Financing for Afghanistan COVID-19 Emergency Response and Health Systems Preparedness Project ↗ | Activo | 113 M US$ | 18 de marzo de 2021 | Health | |
| Afghanistan COVID-19 Emergency Response and Health Systems Preparedness Project ↗ | Activo | 100 M US$ | 2 de abril de 2020 | 30 de junio de 2025 | Health |
| Strengthening Afghanistan’s Financial Intermediation ↗ | Activo | 100 M US$ | 28 de septiembre de 2020 | 31 de octubre de 2025 | ICT Infrastructure |
| Emergency Agriculture and Food Supply Project ↗ | Activo | 100 M US$ | 4 de agosto de 2020 | 30 de junio de 2025 | Irrigation and Drainage |
| Women's Economic Empowerment Rural Development Project ↗ | Activo | 100 M US$ | 28 de septiembre de 2018 | 30 de junio de 2025 | Social Protection |
| Fiscal Performance Improvement Support Project (FSP): ↗ | Activo | 100 M US$ | 19 de diciembre de 2017 | 30 de junio de 2025 | Central Government (Central Agencies) |
| Water Emergency Relief Project ↗ | Activo | 100 M US$ | 30 de junio de 2025 | Irrigation and Drainage | |
| Additional Financing for Afghanistan Emergency Food Security Project ↗ | Activo | 100 M US$ | Crops | ||
| Education Emergency Response in Afghanistan (EERA) ↗ | Activo | 100 M US$ | 31 de diciembre de 2026 | Primary Education | |
| Tackling Afghanistan’s Government HRM and Institutional Reforms ↗ | Activo | 75 M US$ | 19 de diciembre de 2018 | 30 de junio de 2025 | Central Government (Central Agencies) |
| Education Emergency Response in Afghanistan Additional Financing ↗ | Activo | 70 M US$ | 12 de diciembre de 2024 | ||
| Herat Electrification Project ↗ | Activo | 60 M US$ | 13 de junio de 2017 | 30 de junio de 2025 | Energy Transmission and Distribution |
| Afghanistan Gas Project (AGASP) ↗ | Activo | 52,5 M US$ | 26 de noviembre de 2019 | 30 de junio de 2025 | Oil and Gas |
| Afghanistan Digital CASA Project ↗ | Activo | 51 M US$ | 28 de marzo de 2018 | 30 de junio de 2025 | ICT Infrastructure |
| Public-Private Partnerships and Public Investment Advisory Project ↗ | Activo | 50 M US$ | 27 de junio de 2018 | 30 de junio de 2025 | Capital Markets |
| Higher Education Development Project ↗ | Activo | 50 M US$ | 30 de junio de 2025 | Tertiary Education | |
| Payments Automation and Integration of Salaries in Afghanistan (PAISA) ↗ | Activo | 45 M US$ | 25 de abril de 2019 | 30 de junio de 2025 | Banking Institutions |
| Cities Investment Program ↗ | Activo | 42,5 M US$ | 19 de diciembre de 2018 | 30 de junio de 2025 | Sub-National Government |
| Modernizing Afghan State-Owned Banks Project ↗ | Activo | 40 M US$ | 28 de marzo de 2018 | 30 de junio de 2025 | Public Administration - Financial Sector |
| Afghanistan Land Administration System Project ↗ | Activo | 35 M US$ | 25 de abril de 2019 | 30 de junio de 2025 | Public Administration - Agriculture, Fishing & Forestry |
| CASA-1000 Community Support Program (P149410) ↗ | Activo | 30 M US$ | 30 de junio de 2025 | Energy Transmission and Distribution | |
| EQRA Additional Financing ↗ | Activo | 25 M US$ | Secondary Education | ||
| Afghanistan NGO/CSO Capacity Support Project ↗ | Activo | 20 M US$ | 31 de octubre de 2024 | Public Administration - Social Protection | |
| EMERGe ↗ | Activo | 16 M US$ | 28 de marzo de 2024 | 30 de junio de 2025 | |
| AF Additional Financing: Irrigation Restoration and Development ↗ | Activo | 7 M US$ | Irrigation and Drainage | ||
| Additional Financing for the Higher Education Development Project ↗ | Activo | 5 M US$ | Tertiary Education | ||
| Women's Economic Empowerment National Priority Program ↗ | Activo | 1 M US$ | 30 de junio de 2025 | Social Protection | |
| Kabul Municipal Development Program ↗ | Activo | – | 30 de junio de 2025 | Sub-National Government | |
| Naghlu Hydropower Rehabilitation Project ↗ | Activo | – | 30 de junio de 2025 | Renewable Energy Hydro | |
| CGAP Microfinance Framework for Afghanistan ↗ | Activo | – | Micro- and SME finance |
Ver las licitaciones 57 Proveedores y prestadores en Afganistán → Todos los países
Fuente: Banco Mundial, Contract Awards in Investment Project Financing y API de proyectos, licencia CC BY 4.0. Actualizado el 17 de noviembre de 2026. Importes en dólares estadounidenses.