352 contratti, 37,1 Mln USD, 169 imprese diverse. Il 99 % del valore è andato a imprese del paese.
Imprese che vincono di più
| Impresa | Paese d'origine | Contratti | Valore | Categoria principale |
|---|---|---|---|---|
| KUNDUZ SHAMAL CONSTRUCTION AND ROAD BUILDING COMPANY | Afghanistan | 15 | 3,47 Mln USD | Works |
| BETTER FUTURE CONSTRUCTION AND ROAD BUILDING COMPANY | Afghanistan | 11 | 2,12 Mln USD | Works |
| SALAR PAHTOON CONSTRUCTION COMPANY | Afghanistan | 16 | 1,41 Mln USD | Works |
| ABDUL RAHIMZAI AFGHAN CONSTRUCTION AND ENGINEERING COMPANY | Afghanistan | 6 | 1,34 Mln USD | Works |
| TAKWIN CONSTRUCTION & ELECTRICAL ENGINEERING COMPANY | Afghanistan | 5 | 1,01 Mln USD | Works |
| BUILDS WICK CONSTRUCTION AND ROAD BUILDING COMPANY | Afghanistan | 4 | 956K USD | Works |
| SAMSOR AMIN CONSTRUCTION AND ENGINEERING COMPANY | Afghanistan | 3 | 878K USD | Works |
| SEFAT CONSTRUCTION COMPANY | Afghanistan | 5 | 722K USD | Works |
| MASS LOGISTIC & CONSTRUCTION COMPANY | Afghanistan | 6 | 697K USD | Works |
| CHAKABI CONSTRUCTION AND ROAD BUILDING LTD | Afghanistan | 1 | 690K USD | Works |
| ANWAR HAYATI CONSTRUCTION | Afghanistan | 2 | 617K USD | Works |
| QAIS NAZIR CONSTRUCTION ROAD BUILDING COMPANY | Afghanistan | 5 | 593K USD | Works |
| KAR ANDISH CONSTRUCTION COMPANY | Afghanistan | 4 | 584K USD | Works |
| ASR-E- NAWIN AFGHAN CONSTRUCTION COMPANY | Afghanistan | 2 | 528K USD | Works |
| MAKA CONSTRUCTION COMPANY | Afghanistan | 3 | 524K USD | Works |
Contratti aggiudicati di recente
| Data | Impresa | Oggetto | Valore | Procedura |
|---|---|---|---|---|
| 10 settembre 2026 | KUNDUZ SHAMAL CONSTRUCTION AND ROAD BUILDING COMPANY | Construction of Pipe Scheme Project at Dasht-e-Layli Villages in Qusthtepa District Jawzjan Province Rebid-II Water Emergency Relief Project ↗ | 530K USD | Request for Bids |
| 6 settembre 2026 | SHAKAR LAB YAFTAL CONSTRUCTION, ROAD BUILDING COMPANY | Construction of Remaining works of Gravity -Fed Pipe Scheme in Dasht-e-Ping village in Arghanjkhaw district of Badakhshan province Ref No: WB/WERP/AKF/BAD/ARGHA Water Emergency Relief Project ↗ | 35K USD | Direct Selection |
| 2 settembre 2026 | LEMAR WAZIRI CONSTRUCTION | Construction of Gravity-Fed Pipe System in Bagh Darah village in Puli Hisar District and Bain Deh in Khinjan District of Baghlan Province Ref No.: WB/WERP/AKF/B Water Emergency Relief Project ↗ | 315K USD | Request for Quotations |
| 13 agosto 2026 | ABDUL RAHIMZAI AFGHAN CONSTRUCTION AND ENGINEERING COMPANY | Construction of Ahmad Abad Village Solar Powered Pipe Scheme Project, Kohsan District, Herat Province under Ref: WB/WERP/DACAAR/HRT/KOH/AHMADA/W-136-DC Water Emergency Relief Project ↗ | 347K USD | Direct Selection |
| 30 giugno 2026 | UHY AFGHANISTAN - SHAFIQ UMAR DARAZ & CO. CHARTERED ACCOUNTANTS | Consultancy Services for External Audit Reference NO: AKF-A/EMERGE/CS-2 Empowering Microfinance and Enterprises for Resilience and Growth ↗ | 6K USD | Consultant Qualification Selection |
| 29 giugno 2026 | NEXIA GMBH (Germania) | Draft negotiated lump-sum contract for External Audit (Component 1) – EMERGe Project (ACGF EMERGe C-23) – Nexia GmbH Empowering Microfinance and Enterprises for Resilience and Growth ↗ | 10,3K USD | Direct Selection |
| 14 maggio 2026 | SHAHBAZ SARIR CONSTRUCTION AND ROAD BUILDING COMPANY | Construction of Pipe Scheme with a Solar pump system Naw-abad village in Saighan District of Bamyan Province Ref No: WB/WERP/AKF-A/BMN/SAIGHAN/NAWABAD/W-6 Rebid Water Emergency Relief Project ↗ | 74K USD | Request for Quotations |
| 23 aprile 2026 | EHYA WA EBDA CONSTRUCTION | Construction of Gravity -Fed Pipe Scheme (PSGS) in Dehan-e-Khawak village in Paryan District and in Laghana of Bazarak District and Debdia Village: WB/WERP/AKF/ Water Emergency Relief Project ↗ | 133K USD | Request for Quotations |
| 13 aprile 2026 | BROTHERS MOTAWAKIL COMPANY | Construction of Pipe Scheme with a Solar pump system in Bini Mang phase 1 village in Darah-e-Souf Bala District of Samangan Province Ref No: WB/WERP/AKF/SAM/DAR Water Emergency Relief Project ↗ | 54,8K USD | Request for Quotations |
| 13 aprile 2026 | TAKWIN CONSTRUCTION & ELECTRICAL ENGINEERING COMPANY | Procurement of the construction of Ahmad Abad Village Solar Powered Pipe Scheme Project, Kohsan District, Herat Province Identification Number:WB/WERP/DACAAR/HR Water Emergency Relief Project ↗ | 283K USD | Request for Quotations |
| 13 aprile 2026 | HEWAD MAHEER CONSTRUCTION AND ROAD-BUILDING COMPANY | 'Procurement of construction of Sharq Rod Khana Village Solar Powered Pipe Scheme Project, Gulran District, Herat Province Identification Number: WB/WERP/DACAAR Water Emergency Relief Project ↗ | 112K USD | Request for Quotations |
| 6 aprile 2026 | SERAT RADICAL LOGISTIC AND CONSTRUCTION SERVICES | Procurement of construction of Sayed Khel Village Solar Powered Pipe Scheme Project, Arghandab District, Zabul Province WB/WERP/DACAAR/ZBL/ARGHAND /SAYED/W-134 Water Emergency Relief Project ↗ | 112K USD | Request for Quotations |
| 2 aprile 2026 | STARRY CONSTRUCTION COMPANY | Procurement of construction of Solar Powered Pipe Scheme Project in Shekhan Ada and Sulaiman Khil villages in Mizan District in Zabul Province Water Emergency Relief Project ↗ | 162K USD | Request for Quotations |
| 1 aprile 2026 | MOHAMMAD SALEM IBRAHIM KHIL CONSTRUCTION AND ROAD BUILDING COMPANY | Construction of Pipe Scheme with Solar-Powered Slow Sand Filtration System in Patayar Village in Shortapa District of Balkh Province. Ref No: WB/WERP/AKF/BAL/SH Water Emergency Relief Project ↗ | 110K USD | Request for Quotations |
| 1 aprile 2026 | BALKH SABZ PESHGAM LOGISTICS SERVICES AND CONSTRUCTION CO | Construction of Pipe Scheme with Solar-Powered Slow Sand Filtration System in Patayar Village in Shortapa District of Balkh Province. Ref No: WB/WERP/AKF/BAL/SH Water Emergency Relief Project ↗ | 110K USD | Request for Quotations |
| 1 aprile 2026 | KHANMOHAMMAD WALI ZADA CONSTRUCTION COMPANY | Construction of Pipe Scheme with Solar-Powered Slow Sand Filtration System in Jairatan Village in Sharak-e-Hayratan District of Balkh Province Ref No: WB/WERP/A Water Emergency Relief Project ↗ | 154K USD | Request for Quotations |
| 24 marzo 2026 | KAPISA KOHNA DEH CONSTRUCTION COMPANY | Construction of Pipe Scheme with a Solar pump system in Baghe Now village in Khinj District of Panjshir Province Ref No: WB/WERP/AKF/PANJ/KHINJ/BAGHENEOW/W-221 Water Emergency Relief Project ↗ | 38,6K USD | Request for Quotations |
| 18 marzo 2026 | KOHBAND KAPISA CONSTRUCTION & ROAD BUILDING COMPANY | Procurement of construction of Omarzai Village Solar Powered Pipe Scheme Project, Koshamand District, Paktika Province Water Emergency Relief Project ↗ | 98K USD | Request for Quotations |
| 18 marzo 2026 | AFGHANISTAN ALI BABA CONSTRUCTION & ENGINEERING | Procurement of construction of Ragha Village Solar Powered Pipe Scheme Project, Gomal District, Paktika Province Water Emergency Relief Project ↗ | 73,6K USD | Request for Quotations |
| 18 marzo 2026 | AL IMRAN BISMILWALL CONSTRUCTION COMPANY | Procurement of Construction of Karato Boldak Village Solar Powered Pipe Scheme Project, Arghandab District, Zabul Province Identification Number: WB/WERP/DACAAR Water Emergency Relief Project ↗ | 79,7K USD | Request for Quotations |
| 17 marzo 2026 | NEEKZAD WADAN CONSTRUCTION COMPANY | Procurement of Construction of Solar Powered Pipe Scheme Project in Baylogh, Mirzayan, Dawoodzai and Lodin Kali Villages in Day-e-Chopan District, Zabul Provinc Water Emergency Relief Project ↗ | 305K USD | Request for Quotations |
| 17 marzo 2026 | MOHAMMAD KHALID CONSTRUCTION COMPANY | Procurement of construction of Rahman Kalay Village Solar Powered Pipe Scheme Project, Nawa District, Ghazni Province Water Emergency Relief Project ↗ | 86,2K USD | Request for Quotations |
| 17 marzo 2026 | HEWAD MAHEER CONSTRUCTION AND ROAD-BUILDING COMPANY | Procurement of construction of Ali Sakht Bazar Village Solar Powered Pipe Scheme Project, Khak e Afghan District, Zabul Province Identification Number: WB/WERP/ Water Emergency Relief Project ↗ | 102K USD | Request for Quotations |
| 17 marzo 2026 | BROTHERAN ESMATI GHORI CONSTRUCTION CO | Procurement of construction of Dasht e Mahal Samizai Village Solar Powered Pipe Scheme Project, Shindand District, Herat Province Identification Number: WB/WERP Water Emergency Relief Project ↗ | 87,9K USD | Request for Quotations |
| 17 marzo 2026 | AL TAWAKAL ROAD AND CONSTRUCTION COMPANY | Procurement of construction of Shekhzada Village Solar Powered Pipe Scheme Project, Karokh District, Herat Province Water Emergency Relief Project ↗ | 72,7K USD | Request for Quotations |
| 17 marzo 2026 | AFGHANISTAN ALI BABA CONSTRUCTION & ENGINEERING | Procurement of Construction Solar Powered Pipe Scheme Project in Mussa Khil Babo Khil and Zangi Khil villages in Gomal District, Paktika Province Identification Water Emergency Relief Project ↗ | 107K USD | Request for Quotations |
| 17 marzo 2026 | AFGHANISTAN ALI BABA CONSTRUCTION & ENGINEERING | Procurement of construction of Chateri Village Solar Powered Pipe Scheme Project, Waza e Khwa District, Paktika Province Request for Quotation No: WB/WERP/DACAA Water Emergency Relief Project ↗ | 72,1K USD | Request for Quotations |
| 17 marzo 2026 | BILAL HELAL CONSTRUCTION ROAD BUILDING & LOGISTIC COMPANY | Procurement of construction of Payen Deh Village Solar Powered Pipe Scheme Project, Jani Khel District, Paktika Province. Identification Number: WB/WERP/DACAAR/ Water Emergency Relief Project ↗ | 83,3K USD | Request for Quotations |
| 16 marzo 2026 | HELAL HAQMAL CONSTRUCTION ROAD BUILDING COMPANY | Procurement of the construction of Takhom Potai Village Solar Powered Pipe Scheme Project, Mizan District, Zabul Province Identification Number: WB/WERP/DACAAR/ Water Emergency Relief Project ↗ | 80,1K USD | Request for Quotations |
| 9 marzo 2026 | NAHID NEDA TRADING AND CONSTRUCTION COMPANY | Construction of Pipe Scheme with a Solar pump system in Ashoor Bic Khill village in Jabalusaraj District of Parwan Province, WB/WERP/AKF/PAR/JABALSARAJ/ASHOOR/W Water Emergency Relief Project ↗ | 42,9K USD | Request for Quotations |
| 9 marzo 2026 | SALAHUDIN SODAIS CONSTRUCTION COMPANY | Construction of Pipe Scheme Project at Memlika Villages in Faizabad District Jawzjan Province Water Emergency Relief Project ↗ | 253K USD | Request for Quotations |
| 8 marzo 2026 | SINA MUSADIQ CONSTRUCTION & LOGISTIC SERVICES COMPANY | Construction of Pipe Scheme with a Solar pump system in Amba-e-Seya Dara village in Doshi District in Baghlan province, Ref No: WB/WERP/AKF/BAG/DOSHI/AMBAYSYADA Water Emergency Relief Project ↗ | 25,5K USD | Request for Quotations |
| 8 marzo 2026 | PARSA LANGARY ARCHITECTURE, CONSTRUCTION & ROAD BUILDING | Construction of Pipe Scheme with a Solar pump system in Amba-e-Seya Dara village in Doshi District in Baghlan province, Ref No: WB/WERP/AKF/BAG/DOSHI/AMBAYSYADA Water Emergency Relief Project ↗ | 25,5K USD | Request for Quotations |
| 5 marzo 2026 | UNIQUE EXCLUSIVE CONSTRUCTION AND LOGISTIC SERVICES | Construction of Pipe Scheme with a Solar pump system in Langar Khana Khord village in Nahr-e-Shahi District of Balkh Province, Ref No: WB/WERP/AKF/BAL/NAHRSHAHI Water Emergency Relief Project ↗ | 79,9K USD | Request for Quotations |
| 3 marzo 2026 | KHANMOHAMMAD WALI ZADA CONSTRUCTION COMPANY | Construction of Pipe Scheme with a Solar pump system in Qoshumsay village in Keshindah District of Balkh Province Ref No: WB/WERP/AKF/BAL/KESHENDEH/QUSHMSAY/W-2 Water Emergency Relief Project ↗ | 151K USD | Request for Quotations |
| 3 marzo 2026 | BARADARANE YUSUF QASIMI CONSTRUCTION COMPANY | Construction of Pipe Scheme with a Solar pump system in Bini Mang Phase 2 and Sar-e-Shorab villages in Darah-e-Souf District in Samangan Province. Ref No: WB/WE Water Emergency Relief Project ↗ | 164K USD | Request for Quotations |
| 3 marzo 2026 | STARRY CONSTRUCTION COMPANY | Procurement of construction of Zangali Loi Kali Village Solar Powered Pipe Scheme Project, Khak-e-Afghan District, Zabul Province Water Emergency Relief Project ↗ | 101K USD | Request for Quotations |
| 26 febbraio 2026 | SEDDIQ AMINI CONSTRUCTION AND LOGISTIC SERVICES COMPANY | Construction of Pipe Scheme with a Solar pump system in Nawabad village in Unaba District of Panjshir Province. Ref No: WB/WERP/AKF/PANJ/UNABA/NAWABAD/W-215 Water Emergency Relief Project ↗ | 68,7K USD | Request for Quotations |
| 26 febbraio 2026 | BUILDS WICK CONSTRUCTION AND ROAD BUILDING COMPANY | Procurement of construction of Manarai Village Solar Powered Pipe Scheme Project, Koshamand District, Paktika Province Identification Number: WB/WERP/DACAAR/PKT Water Emergency Relief Project ↗ | 115K USD | Request for Quotations |
| 26 febbraio 2026 | AL TAWAKAL ROAD AND CONSTRUCTION COMPANY | Procurement of Construction of Anjirak Village Solar-Powered Pipe Scheme Project, Karukh District, Herat Province Request for Quotation No: WB/WERP/DACAAR/HRT/K Water Emergency Relief Project ↗ | 100K USD | Request for Quotations |
| 23 febbraio 2026 | AFGHANISTAN ALI BABA CONSTRUCTION & ENGINEERING | Procurement of construction of Kunda Khel Village Solar Powered Pipe Scheme Project, Shakeen District, Paktika Province Identification Number: WB/WERP/DACAAR/PK Water Emergency Relief Project ↗ | 52,2K USD | Request for Quotations |
| 23 febbraio 2026 | BUILDS WICK CONSTRUCTION AND ROAD BUILDING COMPANY | Procurement of construction of Mohammad Khel Village Solar Powered Pipe Scheme Project, Nawa District, Ghazni Province Request for Quotation No: WB/WERP/DACAAR/ Water Emergency Relief Project ↗ | 178K USD | Request for Quotations |
| 19 febbraio 2026 | HELAL HAQMAL CONSTRUCTION ROAD BUILDING COMPANY | Procurement of construction of Solar Powered Pipe Scheme Project, in Alizai Kaga and Barimi villages in Charbaran District in Paktika Province Identification Nu Water Emergency Relief Project ↗ | 127K USD | Request for Quotations |
| 18 febbraio 2026 | SABZ JAWANAN CONSTRUCTION COMPANY | Construction of Pipe Scheme with a Solar pump system in Zeri Dara Goli village in Kahmard district of Bamyan Province Ref No.: WB/WERP/AKF/BAM/KAHMARD/ZERIDARAG Water Emergency Relief Project ↗ | 76,4K USD | Request for Quotations |
| 16 febbraio 2026 | PARSA BADAKHSHAN CONSTRUCTION AND ROAD BUILDING COMPANY | Construction of Gravity-Fed Pipe System in Bedikhwah village in Khahan District of Badakhshan Province. Ref No: WB/WERP/AKF/BAD/KHAHAN/BEDIKHWAH/W-196 Water Emergency Relief Project ↗ | 39,4K USD | Request for Quotations |
| 16 febbraio 2026 | MASS LOGISTIC & CONSTRUCTION COMPANY | Construction of Gravity-Fed Pipe System in Kaywan Phase 1 and 2 villages in Puli Hisar district Baghlan Province. Ref No: WB/WERP/AKF/BAG/PULH/KAYWAN1&2/W-212/2 Water Emergency Relief Project ↗ | 88,7K USD | Request for Quotations |
| 16 febbraio 2026 | HOTAK JAWADI CONSTRUCTION COMPANY | Procurement of the construction of Payenda Khel Village Solar Powered Pipe Scheme Project, Ab Band District, Ghazni Province Identification Number: WB/WERP/DACA Water Emergency Relief Project ↗ | 84,7K USD | Request for Quotations |
| 16 febbraio 2026 | SAMSOR AMIN CONSTRUCTION AND ENGINEERING COMPANY | Procurement of construction of Solar-Powered Pipe Scheme Project in Shinkowal, Braj, and Lasbandi villages in Wazakhwah District in Paktika Province Identificat Water Emergency Relief Project ↗ | 333K USD | Request for Quotations |
| 12 febbraio 2026 | SHAMAL NAZARI CONSTRUCTION AND ROAD BUILDING COMPANY | Construction of Gravity-Fed Pipe System in Wuch Sufla phase 1 & 2 in Khost District of Baghlan Province,WB/WERP/AKF/BAG/KHOST/WUCHS1&2/W-203/204 Water Emergency Relief Project ↗ | 112K USD | Request for Quotations |
| 12 febbraio 2026 | OMID PIROZKOH CONSTRUCTION CO. | Procurement of Construction of Bakhtabad Hussainzai Village Solar Powered Pipe Scheme Project, Shindand District, Herat Province Request for Quotation No:WB/WER Water Emergency Relief Project ↗ | 123K USD | Request for Quotations |
| 11 febbraio 2026 | AFGHANISTAN ALI BABA CONSTRUCTION & ENGINEERING | Procurement of Construction of Sher Guli Village Solar Powered Pipe Scheme Project, Gomal District, Paktika Province Identification Number: WB/WERP/DACAAR/PKT/G Water Emergency Relief Project ↗ | 79,4K USD | Request for Quotations |
| 5 febbraio 2026 | NAWAND NOOR CONSTRUCTION COMPANY | Construction of Pipe Scheme with a Solar pump system in Bland Arigh Ballah village in Zari District of Balkh Province. Ref No: WB/WERP/AKF/BAL/ZARI/BLANDARGHBAL Water Emergency Relief Project ↗ | 74K USD | Request for Quotations |
| 4 febbraio 2026 | MASS LOGISTIC & CONSTRUCTION COMPANY | Construction of Gravity-Fed Pipe System in Durnama and Boura & Zuria villages in Khinj Hesa-e-awal and Khinj District of Panjshir Province , Ref No: WB/WERP/AKF Water Emergency Relief Project ↗ | 151K USD | Request for Quotations |
| 3 febbraio 2026 | HAJI MOHAMMAD OSMANI CONSTRUCTION COMPANY | Construction of Pipe Scheme with a Solar pump system in Shulash Dara village in Namak Ab District in Takhar Province,WB/WERP/AKF/TAK/NAMAKAB/SHULASHDRA/W-202 Water Emergency Relief Project ↗ | 17,7K USD | Request for Quotations |
| 3 febbraio 2026 | BUILDS WICK CONSTRUCTION AND ROAD BUILDING COMPANY | Construction Solar Powered Pipe Scheme Projects in Lawang , Petab and Miryani Latif villages in Gelan District of Ghazni Province Request for Quotation No: WB/W Water Emergency Relief Project ↗ | 363K USD | Request for Quotations |
| 3 febbraio 2026 | QAIS NAZIR CONSTRUCTION ROAD BUILDING COMPANY | Procurement of Solar Powered Pipe Scheme Project, in Jalalzai 1 and 2 villages in Jani Khel District, Paktika Province Identification Number:: WB/WERP/DACAAR/PK Water Emergency Relief Project ↗ | 268K USD | Request for Quotations |
| 3 febbraio 2026 | SAMSOR AMIN CONSTRUCTION AND ENGINEERING COMPANY | Procurement of Construction of Solar Powered Pipe Scheme Project, in Mir Afzal and Sulaimanzai villages in Shakeen District, Paktika Province Ref No: WB/WERP/DA Water Emergency Relief Project ↗ | 155K USD | Request for Quotations |
| 3 febbraio 2026 | MATIN ARIA TRADING AND CONSTRUCTION COMPANY | Procurement of construction of Safari Khail - Qalandar Khail Village Solar Powered Pipe Scheme Project, Khugyani District, Ghazni Province Identification Number Water Emergency Relief Project ↗ | 84,6K USD | Request for Quotations |
| 3 febbraio 2026 | HOTAK JAWADI CONSTRUCTION COMPANY | Procurement of the construction of the Mulla Wasil Village Solar Powered Pipe Scheme Project, Khak-e-Afghan District, Zabul Province Identification Number: WB/W Water Emergency Relief Project ↗ | 72,1K USD | Request for Quotations |
| 2 febbraio 2026 | HELAL HAQMAL CONSTRUCTION ROAD BUILDING COMPANY | Procurement of construction of Haji Malook Village Solar Powered Pipe Scheme Project, Charbaran District, Paktika Province Identification Number: WB/WERP/DACAAR Water Emergency Relief Project ↗ | 64,7K USD | Request for Quotations |
Contract award prices in Afghanistan
The median is the middle amount: half of the contracts are below it, half above. The range goes from the cheapest quarter to the most expensive quarter.
| Type of contract | Contracts | Median | Usual range | Largest contract |
|---|---|---|---|---|
| Goods | 43 | 8,95K USD | 3,74K USD – 26,9K USD | 448K USD |
| Works | 297 | 91,1K USD | 66,2K USD – 137K USD | 690K USD |
| Consulting services | 6 | 32,2K USD | 13,5K USD – 94,1K USD | 391K USD |
| Other services | 6 | 13,8K USD | 3,56K USD – 20,2K USD | 157K USD |
These amounts cover contracts of very different sizes: compare your price with contracts of the same nature and size, and with the project budget if it is published.
Progetti finanziati: in preparazione e in corso
I progetti in preparazione pubblicheranno le loro gare nei prossimi mesi. Registratevi come fornitori presso l'ente beneficiario e seguite i suoi avvisi.
| Progetto | Stato | Importo impegnato | Approvazione | Chiusura | Settore |
|---|---|---|---|---|---|
| Additional Financing for the Afghanistan Community Resilience and Livelihoods Project ↗ | In preparazione | 80 Mln USD | |||
| Human Capital and Opportunities Enhancement Project (HOPE) ↗ | In preparazione | – | |||
| Emergency Food Security Project ↗ | In preparazione | – | |||
| Empowering Microfinance and Enterprises for Resilience and Growth ↗ | In preparazione | – | |||
| AFGHANISTAN HEALTH EMERGENCY RESPONSE ↗ | In preparazione | – | |||
| Afghanistan Sehatmandi Project ↗ | In corso | 600 Mln USD | 28 marzo 2018 | 30 giugno 2025 | Health |
| Afghanistan Health Emergency Response (HER) Project ↗ | In corso | 600 Mln USD | 30 settembre 2025 | Health | |
| Citizens' Charter Afghanistan Project ↗ | In corso | 544 Mln USD | 27 ottobre 2016 | 30 giugno 2025 | Water Supply |
| COVID-19 Relief Effort for Afghan Communities and Households (REACH) ↗ | In corso | 280 Mln USD | 4 agosto 2020 | 30 giugno 2025 | Banking Institutions |
| EQRA ↗ | In corso | 273 Mln USD | 28 settembre 2018 | 30 giugno 2025 | Secondary Education |
| Afghanistan Health Emergency Response (HER) Additional Financing ↗ | In corso | 267 Mln USD | Health | ||
| Afghanistan Community Resilience and Livelihoods Project ↗ | In corso | 265 Mln USD | 31 dicembre 2025 | Other Public Administration | |
| Trans-Hindukush Road Connectivity Project ↗ | In corso | 250 Mln USD | 20 ottobre 2015 | 30 giugno 2025 | Rural and Inter-Urban Roads |
| Afghanistan Water, Sanitation, Hygiene and Institutional Support Project ↗ | In corso | 200 Mln USD | 11 dicembre 2020 | 29 gennaio 2026 | Water Supply |
| Emergency Food Security Project ↗ | In corso | 195 Mln USD | 30 giugno 2025 | Crops | |
| Afghanistan: Eshteghal Zaiee - Karmondena (EZ-Kar) Project ↗ | In corso | 194 Mln USD | 19 dicembre 2018 | 30 giugno 2025 | Other Industry, Trade and Services |
| Second Additional Financing for Citizens' Charter Afghanistan Project ↗ | In corso | 193 Mln USD | 11 dicembre 2020 | Other Education | |
| Citizens' Charter Afghanistan Project - Emergency Regional Displacement Response Additional Financing ↗ | In corso | 172 Mln USD | 13 giugno 2017 | Water Supply | |
| Additional Financing for the Afghanistan Community Resilience and Livelihoods Project ↗ | In corso | 154 Mln USD | 30 aprile 2024 | ||
| AF Irrigation Restoration and Development Project ↗ | In corso | 146 Mln USD | 28 aprile 2011 | 30 giugno 2025 | Irrigation and Drainage |
| Additional Financing for Afghanistan COVID-19 Emergency Response and Health Systems Preparedness Project ↗ | In corso | 113 Mln USD | 18 marzo 2021 | Health | |
| Afghanistan COVID-19 Emergency Response and Health Systems Preparedness Project ↗ | In corso | 100 Mln USD | 2 aprile 2020 | 30 giugno 2025 | Health |
| Strengthening Afghanistan’s Financial Intermediation ↗ | In corso | 100 Mln USD | 28 settembre 2020 | 31 ottobre 2025 | ICT Infrastructure |
| Emergency Agriculture and Food Supply Project ↗ | In corso | 100 Mln USD | 4 agosto 2020 | 30 giugno 2025 | Irrigation and Drainage |
| Women's Economic Empowerment Rural Development Project ↗ | In corso | 100 Mln USD | 28 settembre 2018 | 30 giugno 2025 | Social Protection |
| Fiscal Performance Improvement Support Project (FSP): ↗ | In corso | 100 Mln USD | 19 dicembre 2017 | 30 giugno 2025 | Central Government (Central Agencies) |
| Water Emergency Relief Project ↗ | In corso | 100 Mln USD | 30 giugno 2025 | Irrigation and Drainage | |
| Additional Financing for Afghanistan Emergency Food Security Project ↗ | In corso | 100 Mln USD | Crops | ||
| Education Emergency Response in Afghanistan (EERA) ↗ | In corso | 100 Mln USD | 31 dicembre 2026 | Primary Education | |
| Tackling Afghanistan’s Government HRM and Institutional Reforms ↗ | In corso | 75 Mln USD | 19 dicembre 2018 | 30 giugno 2025 | Central Government (Central Agencies) |
| Education Emergency Response in Afghanistan Additional Financing ↗ | In corso | 70 Mln USD | 12 dicembre 2024 | ||
| Herat Electrification Project ↗ | In corso | 60 Mln USD | 13 giugno 2017 | 30 giugno 2025 | Energy Transmission and Distribution |
| Afghanistan Gas Project (AGASP) ↗ | In corso | 52,5 Mln USD | 26 novembre 2019 | 30 giugno 2025 | Oil and Gas |
| Afghanistan Digital CASA Project ↗ | In corso | 51 Mln USD | 28 marzo 2018 | 30 giugno 2025 | ICT Infrastructure |
| Public-Private Partnerships and Public Investment Advisory Project ↗ | In corso | 50 Mln USD | 27 giugno 2018 | 30 giugno 2025 | Capital Markets |
| Higher Education Development Project ↗ | In corso | 50 Mln USD | 30 giugno 2025 | Tertiary Education | |
| Payments Automation and Integration of Salaries in Afghanistan (PAISA) ↗ | In corso | 45 Mln USD | 25 aprile 2019 | 30 giugno 2025 | Banking Institutions |
| Cities Investment Program ↗ | In corso | 42,5 Mln USD | 19 dicembre 2018 | 30 giugno 2025 | Sub-National Government |
| Modernizing Afghan State-Owned Banks Project ↗ | In corso | 40 Mln USD | 28 marzo 2018 | 30 giugno 2025 | Public Administration - Financial Sector |
| Afghanistan Land Administration System Project ↗ | In corso | 35 Mln USD | 25 aprile 2019 | 30 giugno 2025 | Public Administration - Agriculture, Fishing & Forestry |
| CASA-1000 Community Support Program (P149410) ↗ | In corso | 30 Mln USD | 30 giugno 2025 | Energy Transmission and Distribution | |
| EQRA Additional Financing ↗ | In corso | 25 Mln USD | Secondary Education | ||
| Afghanistan NGO/CSO Capacity Support Project ↗ | In corso | 20 Mln USD | 31 ottobre 2024 | Public Administration - Social Protection | |
| EMERGe ↗ | In corso | 16 Mln USD | 28 marzo 2024 | 30 giugno 2025 | |
| AF Additional Financing: Irrigation Restoration and Development ↗ | In corso | 7 Mln USD | Irrigation and Drainage | ||
| Additional Financing for the Higher Education Development Project ↗ | In corso | 5 Mln USD | Tertiary Education | ||
| Women's Economic Empowerment National Priority Program ↗ | In corso | 1 Mln USD | 30 giugno 2025 | Social Protection | |
| Kabul Municipal Development Program ↗ | In corso | – | 30 giugno 2025 | Sub-National Government | |
| Naghlu Hydropower Rehabilitation Project ↗ | In corso | – | 30 giugno 2025 | Renewable Energy Hydro | |
| CGAP Microfinance Framework for Afghanistan ↗ | In corso | – | Micro- and SME finance |
Vedere le gare 57 Fornitori e prestatori in Afghanistan → Tutti i paesi
Fonte: Banca Mondiale, Contract Awards in Investment Project Financing e API dei progetti, licenza CC BY 4.0. Aggiornato: 17 novembre 2026. Importi in dollari USA.