269 contratos, 121 M US$, 122 empresas distintas. El 11 % del importe fue para empresas del país.
Las empresas que más han ganado
| Empresa | País de origen | Contratos | Importe | Categoría principal |
|---|---|---|---|---|
| HALL CIVIL CONTRACTING PTY LTD | Australia | 1 | 24,2 M US$ | Works |
| CHINA RAILWAY FIRST GROUP CO., LTD | China | 4 | 14,3 M US$ | Works |
| RPA GROUP (FIJI) PTE LIMITED | Fiyi | 2 | 11 M US$ | Works |
| INDIVIDUAL CONSULTANT | Kiribati | 97 | 7,43 M US$ | Consultant Services |
| UNIVERSAL COMMUNICATIONS GROUP PTY LTD | Australia | 2 | 5,18 M US$ | Non-consulting Services |
| STARLINK INTERNET SERVICES | Singapur | 1 | 4,85 M US$ | Non-consulting Services |
| SMEC HOLDINGS PTY. LTD. | Australia | 1 | 4,31 M US$ | Consultant Services |
| GROUPE HUIT | Francia | 1 | 3,05 M US$ | Consultant Services |
| SELLHORN INGENIEURGESELLSCHAFT MBH | Alemania | 1 | 2,71 M US$ | Consultant Services |
| ALEXANDER AND LLOYD AUSTRALIA PTY LTD | Australia | 1 | 2,3 M US$ | Consultant Services |
| BECA INTERNATIONAL CONSULTANTS LIMITED | Nueva Zelanda | 1 | 2,26 M US$ | Consultant Services |
| BECA LIMITED | Nueva Zelanda | 1 | 2,26 M US$ | Consultant Services |
| VS ONE WORLD (PTE) LTD | Singapur | 1 | 1,83 M US$ | Goods |
| OPTICAL SOLUTIONS AUSTRALIA (A HEXATRONIC GROUP COMPANY) | Australia | 3 | 1,83 M US$ | Goods |
| ACCENTURE NEW ZEALAND | Nueva Zelanda | 1 | 1,74 M US$ | Consultant Services |
Últimos contratos adjudicados
| Fecha | Empresa | Objeto | Importe | Método |
|---|---|---|---|---|
| 28 de octubre de 2026 | INDIVIDUAL CONSULTANT | KKIP FMA (Financial Managament Assistant) Kiribati Kiritimati Infrastructure Project ↗ | 71,5 mil US$ | Individual Consultant Selection |
| 16 de octubre de 2026 | TAKA CONSTRUCTIONS | Local Construction of the Mini Laboratory Foundation Support -Betio Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 116 mil US$ | Request for Quotations |
| 15 de octubre de 2026 | KIRIBATI WOMEN AND CHILDREN SUPPORT CENTRE | Technical Assistance for GBV handling system Kiribati Kiritimati Infrastructure Project ↗ | 235 mil US$ | Direct Selection |
| 9 de octubre de 2026 | INDIVIDUAL CONSULTANT | Environmental Safeguard Officer South Tarawa Sanitation Project ↗ | 28,3 mil US$ | Individual Consultant Selection |
| 1 de octubre de 2026 | BECA INTERNATIONAL CONSULTANTS LIMITED (Nueva Zelanda) | Design and Supervision Services - Aviation and Roads, including operational Guidance for Resilience and Sustainable Kiribati Kiritimati Infrastructure Project ↗ | 2,26 M US$ | Quality And Cost-Based Selection |
| 1 de octubre de 2026 | BECA LIMITED (Nueva Zelanda) | Design and Supervision Services - Aviation and Roads, including operational Guidance for Resilience and Sustainable Kiribati Kiritimati Infrastructure Project ↗ | 2,26 M US$ | Quality And Cost-Based Selection |
| 29 de septiembre de 2026 | NEW ZEALAND INSTITUTE FOR PUBLIC HEALTH AND FORENSIC SCIENCE (Nueva Zelanda) | Groundwater and Marine Water Quality Monitoring Program South Tarawa Sanitation Project ↗ | 431 mil US$ | Quality And Cost-Based Selection |
| 29 de septiembre de 2026 | EARTH SCIENCE NEW ZEALAND (Nueva Zelanda) | Groundwater and Marine Water Quality Monitoring Program South Tarawa Sanitation Project ↗ | 431 mil US$ | Quality And Cost-Based Selection |
| 28 de septiembre de 2026 | RPA GROUP (FIJI) PTE LIMITED (Fiyi) | Design and Build of Sewerage Connections in Bikenibeu South Tarawa Sanitation Project ↗ | 6,97 M US$ | Request for Quotations |
| 16 de septiembre de 2026 | INDIVIDUAL CONSULTANT (Suiza) | Senior Course Modules Developer South Tarawa Sanitation Project ↗ | 30,5 mil US$ | Individual Consultant Selection |
| 16 de septiembre de 2026 | GORAN KURTOVIĆ (Bosnia y Herzegovina) | Procurement Specialist South Tarawa Sanitation Project ↗ | 35 mil US$ | Direct Selection |
| 10 de septiembre de 2026 | INDIVIDUAL CONSULTANT | Prefabricated Building Foundation Design and Engineering Services P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project ↗ | 13,6 mil US$ | Individual Consultant Selection |
| 9 de septiembre de 2026 | CHINA RAILWAY FIRST GROUP CO., LTD (China) | Construction of On-Site Sanitation Facilities for the 4 Communities_Lot 1 South Tarawa Sanitation Project ↗ | 8,01 M US$ | Request for Quotations |
| 9 de septiembre de 2026 | CHINA RAILWAY FIRST GROUP CO., LTD (China) | Construction of On-Site Sanitation Facilities for the 4 Communities_Lot 2 South Tarawa Sanitation Project ↗ | 2,59 M US$ | Request for Quotations |
| 9 de septiembre de 2026 | CHINA RAILWAY FIRST GROUP CO., LTD (China) | Construction of On-Site Sanitation Facilities for the 4 Communities_Lot 3 South Tarawa Sanitation Project ↗ | 1,15 M US$ | Request for Quotations |
| 9 de septiembre de 2026 | CHINA RAILWAY FIRST GROUP CO., LTD (China) | Construction of On-Site Sanitation Facilities for the 4 Communities_Lot 4 South Tarawa Sanitation Project ↗ | 2,55 M US$ | Request for Quotations |
| 8 de septiembre de 2026 | SAPHERA SERVICES | Supply of GSD IT Equipment and Solar Salt equipment and tools Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 100 mil US$ | Request for Quotations |
| 1 de septiembre de 2026 | SUNLIGHT ENTERPRISES | Final Sign Contract Kiribati Health Systems Strengthening Project ↗ | 67,8 mil US$ | Request for Quotations |
| 31 de agosto de 2026 | KIRI AIR SERVICES | BNL IT Equipment P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project ↗ | 49,8 mil US$ | Request for Quotations |
| 28 de agosto de 2026 | INDIVIDUAL CONSULTANT (Canadá) | Signed Contract Kiribati Health Systems Strengthening Project ↗ | 43,2 mil US$ | Individual Consultant Selection |
| 17 de agosto de 2026 | RAVI RAVINESH RAM (Fiyi) | KI-MISE-568272-CS-CDS - Compliance Engineer South Tarawa Water Supply Project ↗ | 31 mil US$ | Direct Selection |
| 27 de julio de 2026 | INDIVIDUAL CONSULTANT | BNL Technical Officer (3rd ranked candidate was awarded due to unavailability of the 1st and 2nd ranked candidates). P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project ↗ | 5,43 mil US$ | Individual Consultant Selection |
| 22 de julio de 2026 | INDIVIDUAL CONSULTANT | BNL Senior Technical Officer P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project ↗ | 7,43 mil US$ | Individual Consultant Selection |
| 20 de julio de 2026 | INDIVIDUAL CONSULTANT | National Consultant - Comprehensive Assessment of Local Government Finance and Service Delivery in Kiribati Kiribati Outer Islands Resilience and Adaptation Project ↗ | 10,3 mil US$ | Individual Consultant Selection |
| 6 de julio de 2026 | TATYANA NYCHYPEROVYCHY (Canadá) | Signed Contract Kiribati Health Systems Strengthening Project ↗ | 55,8 mil US$ | Direct Selection |
| 3 de julio de 2026 | ACCENTURE NEW ZEALAND (Nueva Zelanda) | Government Productivity and Communication System, and Hybrid Cloud Advisory Services (Phase 1) Kiribati Digital Government Project ↗ | 1,74 M US$ | Direct Selection |
| 2 de julio de 2026 | EXCELOR HOLDINGS GROUP (Bulgaria) | Aircraft Rescue and Fire Fighting (ARFF) vehicles Kiribati Kiritimati Infrastructure Project ↗ | 1,73 M US$ | Request for Bids |
| 2 de julio de 2026 | SICHUAN CHUANXIAO FIRE TRUCKS MANUFACTURING CO., LTD (China) | Aircraft Rescue and Fire Fighting (ARFF) vehicles Kiribati Kiritimati Infrastructure Project ↗ | 1,73 M US$ | Request for Bids |
| 26 de junio de 2026 | LMTA | Project Vehicles - DTO/MICT Kiribati Digital Government Project ↗ | 75,9 mil US$ | Request for Quotations |
| 25 de junio de 2026 | INDIVIDUAL CONSULTANT (Australia) | Senior Policy Development Consultant South Tarawa Sanitation Project ↗ | 96,3 mil US$ | Individual Consultant Selection |
| 19 de junio de 2026 | VS ONE WORLD (PTE) LTD (Singapur) | KI-MICTTD-470992-GO-RFQ - Containerized Data Center & Government Cloud Equipment Kiribati Digital Government Project ↗ | 1,83 M US$ | Request for Quotations |
| 18 de junio de 2026 | INDIVIDUAL CONSULTANT (Nueva Zelanda) | International TA (support to MCIA) - Comprehensive Assessment of Local Government Finance and Service Delivery in Kiribati (An Analytical Study of Institutional Kiribati Outer Islands Resilience and Adaptation Project ↗ | 68,2 mil US$ | Individual Consultant Selection |
| 16 de junio de 2026 | OPTICAL SOLUTIONS AUSTRALIA (A HEXATRONIC GROUP COMPANY) (Australia) | Wi-Fi/LAN Materials Kiribati Digital Government Project ↗ | 199 mil US$ | Direct Selection |
| 10 de junio de 2026 | MILSEARCH PTY LTD (Australia) | UXO Survey South Tarawa Sanitation Project ↗ | 170 mil US$ | Direct Selection |
| 9 de junio de 2026 | OLIVIER KRUG (Francia) | Renewable Energy Adviser Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 14,7 mil US$ | Direct Selection |
| 2 de junio de 2026 | SEISMIC ASIA PACIFIC PTY LTD (Australia) | Hydrographic Survey Equipment Kiribati Outer Islands Transport Infrastructure Investment Project ↗ | 465 mil US$ | Request for Quotations |
| 24 de mayo de 2026 | KIRIBATI MOTOR COMPANY LIMITED | Supply of Vehicles - Outer Islands Sub-Projects Kiribati Outer Islands Resilience and Adaptation Project ↗ | 722 mil US$ | Request for Quotations |
| 21 de mayo de 2026 | SHANDONG OULIAN STEEL CO. , LTD (China) | Supply of BNL Prefabricated Operations Support Facility P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project ↗ | 76,1 mil US$ | Request for Quotations |
| 18 de mayo de 2026 | INDIVIDUAL CONSULTANT (Australia) | STWSP KI-MISE 524737-CS-INDV - Water Asset Performance Expert South Tarawa Water Supply Project ↗ | 315 mil US$ | Individual Consultant Selection |
| 14 de mayo de 2026 | HEXATRONICS (Australia) | GWAN ITEMS (1st batch) Kiribati Digital Government Project ↗ | 30,7 mil US$ | Direct Selection |
| 13 de mayo de 2026 | INDIVIDUAL CONSULTANT (Ghana) | Senior Project Coordinator South Tarawa Sanitation Project ↗ | 153 mil US$ | Individual Consultant Selection |
| 12 de mayo de 2026 | RACER AUSTRALIA PTY LTD (Australia) | BNL Vehicles P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project ↗ | 193 mil US$ | Request for Quotations |
| 30 de abril de 2026 | DAMMY AND MUDDY INCORPORATED | CPPL SQF Pre-audit Preparation in Kiritimati Island Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 27,2 mil US$ | Direct Selection |
| 16 de abril de 2026 | INDIVIDUAL CONSULTANT | C1-CS-013 - Skilled Technician Support #7 Kiribati Outer Islands Resilience and Adaptation Project ↗ | 69,3 mil US$ | Individual Consultant Selection |
| 16 de abril de 2026 | INDIVIDUAL CONSULTANT | C1-CS-014 - Skilled Technician Support #8 Kiribati Outer Islands Resilience and Adaptation Project ↗ | 69,3 mil US$ | Individual Consultant Selection |
| 16 de abril de 2026 | INDIVIDUAL CONSULTANT | C1-CS-015 - Skilled Technician Support #9 Kiribati Outer Islands Resilience and Adaptation Project ↗ | 69,3 mil US$ | Individual Consultant Selection |
| 16 de abril de 2026 | INDIVIDUAL CONSULTANT | C1-CS-016 - Skilled Technician Support #10 Kiribati Outer Islands Resilience and Adaptation Project ↗ | 69,3 mil US$ | Individual Consultant Selection |
| 13 de abril de 2026 | ACTEUS GROUP (Singapur) | Hook Hanging Scales with remote readers (Crane Scales) Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 28,1 mil US$ | Request for Quotations |
| 2 de abril de 2026 | WANTED AND TRUSTED ENTERPRISE | C2-GO-002 / Supply of Laptops (bags inclusive) for Councils Finance Clerks Kiribati Outer Islands Resilience and Adaptation Project ↗ | 36,6 mil US$ | Request for Quotations |
| 30 de marzo de 2026 | INDIVIDUAL CONSULTANT (Nueva Zelanda) | Independent Completion Report Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 42,5 mil US$ | Individual Consultant Selection |
| 30 de marzo de 2026 | MILSEARCH PTY LTD (Australia) | UXO Clearance at Betio Lab Site Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 192 mil US$ | Direct Selection |
| 30 de marzo de 2026 | DAMMY AND MUDDY INCORPORATED | CPPL SQF Pre-audit Preparation Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 28,1 mil US$ | Direct Selection |
| 30 de marzo de 2026 | UNIVERSAL COMMUNICATIONS GROUP PTY LTD (Nueva Zelanda) | Project Management as a Service Kiribati Digital Government Project ↗ | 367 mil US$ | Direct Selection |
| 18 de marzo de 2026 | TAOTIN TRADING | Supply of Lot 8 land and marine transportation and Lot: 9 Drone Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 72,7 mil US$ | Request for Quotations |
| 18 de marzo de 2026 | AQUARIUM FISH | Petfish handling equipment and materials Lot 4 Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 11,2 mil US$ | Request for Quotations |
| 4 de marzo de 2026 | INTEGRATED MONITORING INC (Estados Unidos) | Supply and Install 3 camera system on 3 Long Liners Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 60 mil US$ | Request for Quotations |
| 4 de marzo de 2026 | OPTICAL SOLUTIONS AUSTRALIA (A HEXATRONIC GROUP COMPANY) (Australia) | Hexatronic's Contract - BNL Machinery, Tools, Materials and Consumables P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project ↗ | 1,46 M US$ | Direct Selection |
| 30 de enero de 2026 | SIMSON MASENGI (Indonesia) | Consultant for Quality Control and Grading of Tuna Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 12,7 mil US$ | Direct Selection |
| 26 de enero de 2026 | SUSTAINABLE WATER SYSTEMS PTY LTD (Australia) | Supply of Solar Saltwater Pump for Kiritimati island - Sustainable Water Systems Pty Ltd Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 31,3 mil US$ | Direct Selection |
| 26 de enero de 2026 | INDIVIDUAL CONSULTANT | Procurement Officer Kiribati Digital Government Project ↗ | 36,3 mil US$ | Individual Consultant Selection |
Precios de contratos adjudicados en Kiribati
La mediana es el importe central: la mitad de los contratos está por debajo y la otra mitad por encima. El rango va del cuarto más barato al cuarto más caro.
| Tipo de contrato | Contratos | Mediana | Rango habitual | Mayor contrato |
|---|---|---|---|---|
| Bienes | 95 | 51,5 mil US$ | 19,3 mil US$ – 199 mil US$ | 1,83 M US$ |
| Obras | 18 | 530 mil US$ | 119 mil US$ – 2,58 M US$ | 24,2 M US$ |
| Servicios de consultoría | 140 | 64,6 mil US$ | 33 mil US$ – 125 mil US$ | 4,31 M US$ |
| Otros servicios | 16 | 169 mil US$ | 64,1 mil US$ – 654 mil US$ | 4,85 M US$ |
Estos importes abarcan contratos de tamaños muy distintos: compare su precio con contratos de la misma naturaleza y tamaño, y con el presupuesto del proyecto si está publicado.
Proyectos financiados: en preparación y activos
Los proyectos en preparación publicarán sus licitaciones en los próximos meses. Regístrese como proveedor ante el prestatario y siga sus avisos.
| Proyecto | Estado | Compromiso | Aprobación | Cierre | Sector |
|---|---|---|---|---|---|
| Kiribati Health Project ↗ | En preparación | 15 M US$ | |||
| Kiritimati Sustainable Development Platform ↗ | En preparación | 10 M US$ | |||
| Kiribati DPO2 ↗ | En preparación | – | |||
| South Tarawa Water Supply Project ↗ | Activo | 56,6 M US$ | 13 de diciembre de 2019 | 30 de junio de 2027 | Water Supply |
| Kiribati Outer Islands Transport Infrastructure Investment Project ↗ | Activo | 42 M US$ | 12 de marzo de 2020 | 31 de diciembre de 2027 | Ports/Waterways |
| Kiribati Outer Islands Resilience and Adaptation Project ↗ | Activo | 20 M US$ | 13 de mayo de 2022 | 31 de agosto de 2028 | Sub-National Government |
| P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project ↗ | Activo | 20 M US$ | 31 de mayo de 2017 | 30 de noviembre de 2026 | ICT Infrastructure |
| Kiribati: Pacific Islands Regional Oceanscape Program ↗ | Activo | 19,5 M US$ | 12 de marzo de 2020 | 30 de junio de 2026 | Public Administration - Agriculture, Fishing & Forestry |
| South Tarawa Sanitation Project ↗ | Activo | 19,5 M US$ | 25 de mayo de 2022 | 31 de mayo de 2028 | Sanitation |
| Kiribati Health Systems Strengthening Project ↗ | Activo | 14 M US$ | 4 de abril de 2022 | 31 de marzo de 2027 | Health |
| Kiribati Digital Government Project ↗ | Activo | 12 M US$ | 25 de mayo de 2022 | 31 de marzo de 2027 | Public Administration - Information and Communications Techn |
| Additional Financing for the Kiribati Outer Islands Transport Infrastructure Investment Project ↗ | Activo | 10 M US$ | 8 de abril de 2024 | ||
| Kiribati First Resilient Growth Development Policy Operation with a Catastrophe Deferred Drawdown Option ↗ | Activo | 10 M US$ | 30 de noviembre de 2023 | 31 de diciembre de 2026 | |
| Statistical Innovation and Capacity Building in Kiribati ↗ | Activo | 2 M US$ | 11 de febrero de 2020 | 30 de junio de 2025 | Central Government (Central Agencies) |
| Kiribati Kiritimati Infrastructure Project ↗ | Activo | – | 13 de diciembre de 2024 | 31 de marzo de 2031 |
Ver las licitaciones 0 Proveedores y prestadores en Kiribati → Todos los países
Fuente: Banco Mundial, Contract Awards in Investment Project Financing y API de proyectos, licencia CC BY 4.0. Actualizado el 17 de noviembre de 2026. Importes en dólares estadounidenses.