269 contrats, 121 M $US, 122 entreprises différentes. 11 % du montant est allé à des entreprises du pays.
Les entreprises qui ont gagné le plus
| Entreprise | Pays d'origine | Contrats | Montant | Domaine principal |
|---|---|---|---|---|
| HALL CIVIL CONTRACTING PTY LTD | Australie | 1 | 24,2 M $US | Works |
| CHINA RAILWAY FIRST GROUP CO., LTD | Chine | 4 | 14,3 M $US | Works |
| RPA GROUP (FIJI) PTE LIMITED | Fidji | 2 | 11 M $US | Works |
| INDIVIDUAL CONSULTANT | Kiribati | 97 | 7,43 M $US | Consultant Services |
| UNIVERSAL COMMUNICATIONS GROUP PTY LTD | Australie | 2 | 5,18 M $US | Non-consulting Services |
| STARLINK INTERNET SERVICES | Singapour | 1 | 4,85 M $US | Non-consulting Services |
| SMEC HOLDINGS PTY. LTD. | Australie | 1 | 4,31 M $US | Consultant Services |
| GROUPE HUIT | France | 1 | 3,05 M $US | Consultant Services |
| SELLHORN INGENIEURGESELLSCHAFT MBH | Allemagne | 1 | 2,71 M $US | Consultant Services |
| ALEXANDER AND LLOYD AUSTRALIA PTY LTD | Australie | 1 | 2,3 M $US | Consultant Services |
| BECA INTERNATIONAL CONSULTANTS LIMITED | Nouvelle-Zélande | 1 | 2,26 M $US | Consultant Services |
| BECA LIMITED | Nouvelle-Zélande | 1 | 2,26 M $US | Consultant Services |
| VS ONE WORLD (PTE) LTD | Singapour | 1 | 1,83 M $US | Goods |
| OPTICAL SOLUTIONS AUSTRALIA (A HEXATRONIC GROUP COMPANY) | Australie | 3 | 1,83 M $US | Goods |
| ACCENTURE NEW ZEALAND | Nouvelle-Zélande | 1 | 1,74 M $US | Consultant Services |
Derniers contrats attribués
| Date | Entreprise | Objet | Montant | Méthode |
|---|---|---|---|---|
| 28 octobre 2026 | INDIVIDUAL CONSULTANT | KKIP FMA (Financial Managament Assistant) Kiribati Kiritimati Infrastructure Project ↗ | 71,5 k $US | Individual Consultant Selection |
| 16 octobre 2026 | TAKA CONSTRUCTIONS | Local Construction of the Mini Laboratory Foundation Support -Betio Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 116 k $US | Request for Quotations |
| 15 octobre 2026 | KIRIBATI WOMEN AND CHILDREN SUPPORT CENTRE | Technical Assistance for GBV handling system Kiribati Kiritimati Infrastructure Project ↗ | 235 k $US | Direct Selection |
| 9 octobre 2026 | INDIVIDUAL CONSULTANT | Environmental Safeguard Officer South Tarawa Sanitation Project ↗ | 28,3 k $US | Individual Consultant Selection |
| 1 octobre 2026 | BECA INTERNATIONAL CONSULTANTS LIMITED (Nouvelle-Zélande) | Design and Supervision Services - Aviation and Roads, including operational Guidance for Resilience and Sustainable Kiribati Kiritimati Infrastructure Project ↗ | 2,26 M $US | Quality And Cost-Based Selection |
| 1 octobre 2026 | BECA LIMITED (Nouvelle-Zélande) | Design and Supervision Services - Aviation and Roads, including operational Guidance for Resilience and Sustainable Kiribati Kiritimati Infrastructure Project ↗ | 2,26 M $US | Quality And Cost-Based Selection |
| 29 septembre 2026 | NEW ZEALAND INSTITUTE FOR PUBLIC HEALTH AND FORENSIC SCIENCE (Nouvelle-Zélande) | Groundwater and Marine Water Quality Monitoring Program South Tarawa Sanitation Project ↗ | 431 k $US | Quality And Cost-Based Selection |
| 29 septembre 2026 | EARTH SCIENCE NEW ZEALAND (Nouvelle-Zélande) | Groundwater and Marine Water Quality Monitoring Program South Tarawa Sanitation Project ↗ | 431 k $US | Quality And Cost-Based Selection |
| 28 septembre 2026 | RPA GROUP (FIJI) PTE LIMITED (Fidji) | Design and Build of Sewerage Connections in Bikenibeu South Tarawa Sanitation Project ↗ | 6,97 M $US | Request for Quotations |
| 16 septembre 2026 | INDIVIDUAL CONSULTANT (Suisse) | Senior Course Modules Developer South Tarawa Sanitation Project ↗ | 30,5 k $US | Individual Consultant Selection |
| 16 septembre 2026 | GORAN KURTOVIĆ (Bosnie-Herzégovine) | Procurement Specialist South Tarawa Sanitation Project ↗ | 35 k $US | Direct Selection |
| 10 septembre 2026 | INDIVIDUAL CONSULTANT | Prefabricated Building Foundation Design and Engineering Services P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project ↗ | 13,6 k $US | Individual Consultant Selection |
| 9 septembre 2026 | CHINA RAILWAY FIRST GROUP CO., LTD (Chine) | Construction of On-Site Sanitation Facilities for the 4 Communities_Lot 1 South Tarawa Sanitation Project ↗ | 8,01 M $US | Request for Quotations |
| 9 septembre 2026 | CHINA RAILWAY FIRST GROUP CO., LTD (Chine) | Construction of On-Site Sanitation Facilities for the 4 Communities_Lot 2 South Tarawa Sanitation Project ↗ | 2,59 M $US | Request for Quotations |
| 9 septembre 2026 | CHINA RAILWAY FIRST GROUP CO., LTD (Chine) | Construction of On-Site Sanitation Facilities for the 4 Communities_Lot 3 South Tarawa Sanitation Project ↗ | 1,15 M $US | Request for Quotations |
| 9 septembre 2026 | CHINA RAILWAY FIRST GROUP CO., LTD (Chine) | Construction of On-Site Sanitation Facilities for the 4 Communities_Lot 4 South Tarawa Sanitation Project ↗ | 2,55 M $US | Request for Quotations |
| 8 septembre 2026 | SAPHERA SERVICES | Supply of GSD IT Equipment and Solar Salt equipment and tools Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 100 k $US | Request for Quotations |
| 1 septembre 2026 | SUNLIGHT ENTERPRISES | Final Sign Contract Kiribati Health Systems Strengthening Project ↗ | 67,8 k $US | Request for Quotations |
| 31 août 2026 | KIRI AIR SERVICES | BNL IT Equipment P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project ↗ | 49,8 k $US | Request for Quotations |
| 28 août 2026 | INDIVIDUAL CONSULTANT (Canada) | Signed Contract Kiribati Health Systems Strengthening Project ↗ | 43,2 k $US | Individual Consultant Selection |
| 17 août 2026 | RAVI RAVINESH RAM (Fidji) | KI-MISE-568272-CS-CDS - Compliance Engineer South Tarawa Water Supply Project ↗ | 31 k $US | Direct Selection |
| 27 juillet 2026 | INDIVIDUAL CONSULTANT | BNL Technical Officer (3rd ranked candidate was awarded due to unavailability of the 1st and 2nd ranked candidates). P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project ↗ | 5,43 k $US | Individual Consultant Selection |
| 22 juillet 2026 | INDIVIDUAL CONSULTANT | BNL Senior Technical Officer P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project ↗ | 7,43 k $US | Individual Consultant Selection |
| 20 juillet 2026 | INDIVIDUAL CONSULTANT | National Consultant - Comprehensive Assessment of Local Government Finance and Service Delivery in Kiribati Kiribati Outer Islands Resilience and Adaptation Project ↗ | 10,3 k $US | Individual Consultant Selection |
| 6 juillet 2026 | TATYANA NYCHYPEROVYCHY (Canada) | Signed Contract Kiribati Health Systems Strengthening Project ↗ | 55,8 k $US | Direct Selection |
| 3 juillet 2026 | ACCENTURE NEW ZEALAND (Nouvelle-Zélande) | Government Productivity and Communication System, and Hybrid Cloud Advisory Services (Phase 1) Kiribati Digital Government Project ↗ | 1,74 M $US | Direct Selection |
| 2 juillet 2026 | EXCELOR HOLDINGS GROUP (Bulgarie) | Aircraft Rescue and Fire Fighting (ARFF) vehicles Kiribati Kiritimati Infrastructure Project ↗ | 1,73 M $US | Request for Bids |
| 2 juillet 2026 | SICHUAN CHUANXIAO FIRE TRUCKS MANUFACTURING CO., LTD (Chine) | Aircraft Rescue and Fire Fighting (ARFF) vehicles Kiribati Kiritimati Infrastructure Project ↗ | 1,73 M $US | Request for Bids |
| 26 juin 2026 | LMTA | Project Vehicles - DTO/MICT Kiribati Digital Government Project ↗ | 75,9 k $US | Request for Quotations |
| 25 juin 2026 | INDIVIDUAL CONSULTANT (Australie) | Senior Policy Development Consultant South Tarawa Sanitation Project ↗ | 96,3 k $US | Individual Consultant Selection |
| 19 juin 2026 | VS ONE WORLD (PTE) LTD (Singapour) | KI-MICTTD-470992-GO-RFQ - Containerized Data Center & Government Cloud Equipment Kiribati Digital Government Project ↗ | 1,83 M $US | Request for Quotations |
| 18 juin 2026 | INDIVIDUAL CONSULTANT (Nouvelle-Zélande) | International TA (support to MCIA) - Comprehensive Assessment of Local Government Finance and Service Delivery in Kiribati (An Analytical Study of Institutional Kiribati Outer Islands Resilience and Adaptation Project ↗ | 68,2 k $US | Individual Consultant Selection |
| 16 juin 2026 | OPTICAL SOLUTIONS AUSTRALIA (A HEXATRONIC GROUP COMPANY) (Australie) | Wi-Fi/LAN Materials Kiribati Digital Government Project ↗ | 199 k $US | Direct Selection |
| 10 juin 2026 | MILSEARCH PTY LTD (Australie) | UXO Survey South Tarawa Sanitation Project ↗ | 170 k $US | Direct Selection |
| 9 juin 2026 | OLIVIER KRUG (France) | Renewable Energy Adviser Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 14,7 k $US | Direct Selection |
| 2 juin 2026 | SEISMIC ASIA PACIFIC PTY LTD (Australie) | Hydrographic Survey Equipment Kiribati Outer Islands Transport Infrastructure Investment Project ↗ | 465 k $US | Request for Quotations |
| 24 mai 2026 | KIRIBATI MOTOR COMPANY LIMITED | Supply of Vehicles - Outer Islands Sub-Projects Kiribati Outer Islands Resilience and Adaptation Project ↗ | 722 k $US | Request for Quotations |
| 21 mai 2026 | SHANDONG OULIAN STEEL CO. , LTD (Chine) | Supply of BNL Prefabricated Operations Support Facility P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project ↗ | 76,1 k $US | Request for Quotations |
| 18 mai 2026 | INDIVIDUAL CONSULTANT (Australie) | STWSP KI-MISE 524737-CS-INDV - Water Asset Performance Expert South Tarawa Water Supply Project ↗ | 315 k $US | Individual Consultant Selection |
| 14 mai 2026 | HEXATRONICS (Australie) | GWAN ITEMS (1st batch) Kiribati Digital Government Project ↗ | 30,7 k $US | Direct Selection |
| 13 mai 2026 | INDIVIDUAL CONSULTANT (Ghana) | Senior Project Coordinator South Tarawa Sanitation Project ↗ | 153 k $US | Individual Consultant Selection |
| 12 mai 2026 | RACER AUSTRALIA PTY LTD (Australie) | BNL Vehicles P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project ↗ | 193 k $US | Request for Quotations |
| 30 avril 2026 | DAMMY AND MUDDY INCORPORATED | CPPL SQF Pre-audit Preparation in Kiritimati Island Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 27,2 k $US | Direct Selection |
| 16 avril 2026 | INDIVIDUAL CONSULTANT | C1-CS-013 - Skilled Technician Support #7 Kiribati Outer Islands Resilience and Adaptation Project ↗ | 69,3 k $US | Individual Consultant Selection |
| 16 avril 2026 | INDIVIDUAL CONSULTANT | C1-CS-014 - Skilled Technician Support #8 Kiribati Outer Islands Resilience and Adaptation Project ↗ | 69,3 k $US | Individual Consultant Selection |
| 16 avril 2026 | INDIVIDUAL CONSULTANT | C1-CS-015 - Skilled Technician Support #9 Kiribati Outer Islands Resilience and Adaptation Project ↗ | 69,3 k $US | Individual Consultant Selection |
| 16 avril 2026 | INDIVIDUAL CONSULTANT | C1-CS-016 - Skilled Technician Support #10 Kiribati Outer Islands Resilience and Adaptation Project ↗ | 69,3 k $US | Individual Consultant Selection |
| 13 avril 2026 | ACTEUS GROUP (Singapour) | Hook Hanging Scales with remote readers (Crane Scales) Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 28,1 k $US | Request for Quotations |
| 2 avril 2026 | WANTED AND TRUSTED ENTERPRISE | C2-GO-002 / Supply of Laptops (bags inclusive) for Councils Finance Clerks Kiribati Outer Islands Resilience and Adaptation Project ↗ | 36,6 k $US | Request for Quotations |
| 30 mars 2026 | INDIVIDUAL CONSULTANT (Nouvelle-Zélande) | Independent Completion Report Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 42,5 k $US | Individual Consultant Selection |
| 30 mars 2026 | MILSEARCH PTY LTD (Australie) | UXO Clearance at Betio Lab Site Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 192 k $US | Direct Selection |
| 30 mars 2026 | DAMMY AND MUDDY INCORPORATED | CPPL SQF Pre-audit Preparation Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 28,1 k $US | Direct Selection |
| 30 mars 2026 | UNIVERSAL COMMUNICATIONS GROUP PTY LTD (Nouvelle-Zélande) | Project Management as a Service Kiribati Digital Government Project ↗ | 367 k $US | Direct Selection |
| 18 mars 2026 | TAOTIN TRADING | Supply of Lot 8 land and marine transportation and Lot: 9 Drone Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 72,7 k $US | Request for Quotations |
| 18 mars 2026 | AQUARIUM FISH | Petfish handling equipment and materials Lot 4 Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 11,2 k $US | Request for Quotations |
| 4 mars 2026 | INTEGRATED MONITORING INC (États-Unis) | Supply and Install 3 camera system on 3 Long Liners Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 60 k $US | Request for Quotations |
| 4 mars 2026 | OPTICAL SOLUTIONS AUSTRALIA (A HEXATRONIC GROUP COMPANY) (Australie) | Hexatronic's Contract - BNL Machinery, Tools, Materials and Consumables P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project ↗ | 1,46 M $US | Direct Selection |
| 30 janvier 2026 | SIMSON MASENGI (Indonésie) | Consultant for Quality Control and Grading of Tuna Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 12,7 k $US | Direct Selection |
| 26 janvier 2026 | SUSTAINABLE WATER SYSTEMS PTY LTD (Australie) | Supply of Solar Saltwater Pump for Kiritimati island - Sustainable Water Systems Pty Ltd Kiribati: Pacific Islands Regional Oceanscape Program ↗ | 31,3 k $US | Direct Selection |
| 26 janvier 2026 | INDIVIDUAL CONSULTANT | Procurement Officer Kiribati Digital Government Project ↗ | 36,3 k $US | Individual Consultant Selection |
Prix des marchés attribués aux Kiribati
La médiane est le montant du milieu : la moitié des contrats est en dessous, l'autre moitié au-dessus. La fourchette va du quart le moins cher au quart le plus cher.
| Type de marché | Contrats | Médiane | Fourchette habituelle | Plus gros contrat |
|---|---|---|---|---|
| Biens | 95 | 51,5 k $US | 19,3 k $US – 199 k $US | 1,83 M $US |
| Travaux | 18 | 530 k $US | 119 k $US – 2,58 M $US | 24,2 M $US |
| Services de consultants | 140 | 64,6 k $US | 33 k $US – 125 k $US | 4,31 M $US |
| Autres services | 16 | 169 k $US | 64,1 k $US – 654 k $US | 4,85 M $US |
Ces montants couvrent des marchés de tailles très différentes : comparez votre prix à des marchés de même nature et de même taille, et au budget du projet s'il est publié.
Projets financés : en préparation et en cours
Les projets en préparation publieront leurs appels d'offres dans les prochains mois. Inscrivez-vous comme fournisseur auprès de l'emprunteur et suivez leurs avis.
| Projet | Statut | Montant engagé | Approbation | Clôture | Secteur |
|---|---|---|---|---|---|
| Kiribati Health Project ↗ | En préparation | 15 M $US | |||
| Kiritimati Sustainable Development Platform ↗ | En préparation | 10 M $US | |||
| Kiribati DPO2 ↗ | En préparation | – | |||
| South Tarawa Water Supply Project ↗ | En cours | 56,6 M $US | 13 décembre 2019 | 30 juin 2027 | Water Supply |
| Kiribati Outer Islands Transport Infrastructure Investment Project ↗ | En cours | 42 M $US | 12 mars 2020 | 31 décembre 2027 | Ports/Waterways |
| Kiribati Outer Islands Resilience and Adaptation Project ↗ | En cours | 20 M $US | 13 mai 2022 | 31 août 2028 | Sub-National Government |
| P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project ↗ | En cours | 20 M $US | 31 mai 2017 | 30 novembre 2026 | ICT Infrastructure |
| Kiribati: Pacific Islands Regional Oceanscape Program ↗ | En cours | 19,5 M $US | 12 mars 2020 | 30 juin 2026 | Public Administration - Agriculture, Fishing & Forestry |
| South Tarawa Sanitation Project ↗ | En cours | 19,5 M $US | 25 mai 2022 | 31 mai 2028 | Sanitation |
| Kiribati Health Systems Strengthening Project ↗ | En cours | 14 M $US | 4 avril 2022 | 31 mars 2027 | Health |
| Kiribati Digital Government Project ↗ | En cours | 12 M $US | 25 mai 2022 | 31 mars 2027 | Public Administration - Information and Communications Techn |
| Additional Financing for the Kiribati Outer Islands Transport Infrastructure Investment Project ↗ | En cours | 10 M $US | 8 avril 2024 | ||
| Kiribati First Resilient Growth Development Policy Operation with a Catastrophe Deferred Drawdown Option ↗ | En cours | 10 M $US | 30 novembre 2023 | 31 décembre 2026 | |
| Statistical Innovation and Capacity Building in Kiribati ↗ | En cours | 2 M $US | 11 février 2020 | 30 juin 2025 | Central Government (Central Agencies) |
| Kiribati Kiritimati Infrastructure Project ↗ | En cours | – | 13 décembre 2024 | 31 mars 2031 |
Voir les appels d'offres 0 Fournisseurs et prestataires aux Kiribati → Tous les pays
Source : Banque mondiale, « Contract Awards in Investment Project Financing » et API des projets, licence CC BY 4.0. Mise à jour le 17 novembre 2026. Montants en dollars US.