314 contratos, 194 M US$, 167 empresas diferentes. 64 % do valor foi para empresas do país.
As empresas que mais ganharam
| Empresa | País de origem | Contratos | Valor | Categoria principal |
|---|---|---|---|---|
| TRANS ENGINEERING GROUP | Uzbequistão | 2 | 13,2 M US$ | Works |
| EXPRESSSERVICE 2008 | Geórgia | 1 | 8,34 M US$ | Works |
| JSC ERISIMEDI | Geórgia | 3 | 7,69 M US$ | Works |
| YDA INSAAT SANAI VE TICARET A.S. | Turquia | 1 | 7,6 M US$ | Works |
| REBUILD LTD | Geórgia | 1 | 7,28 M US$ | Works |
| EMRERAY ENERJI İNŞAAT SANAYI VE TICARET | Turquia | 1 | 7,04 M US$ | Works |
| INDIVIDUAL CONSULTANT | Geórgia | 83 | 6,45 M US$ | Consultant Services |
| PARVUS GROUP | Geórgia | 1 | 5,95 M US$ | Works |
| NSYSTEM | Geórgia | 1 | 5,49 M US$ | Works |
| BALAVARI | Geórgia | 1 | 5,44 M US$ | Works |
| Montran Corporation | Estados Unidos | 2 | 5,08 M US$ | Goods |
| JV ERKERI AND COMFORT | Geórgia | 1 | 5,05 M US$ | Works |
| YOOSHIN ENGINEERING CORPORATION | Coreia do Sul | 2 | 5,04 M US$ | Consultant Services |
| CONSTRUCTION GROUP LLC | Geórgia | 1 | 4,76 M US$ | Works |
| GBG LLC | Geórgia | 2 | 4,61 M US$ | Works |
Últimos contratos adjudicados
| Data | Empresa | Objeto | Valor | Método |
|---|---|---|---|---|
| 23 de outubro de 2026 | GREEN SYSTEMS LLC | Supply and Installation of Routers and Switches (Two Lots) Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 181 mil US$ | Request for Bids |
| 12 de outubro de 2026 | INDIVIDUAL CONSULTANT | Financial Manager Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | 30,1 mil US$ | Individual Consultant Selection |
| 24 de setembro de 2026 | EDISON STORE LTD | Procurement of Resources Required for the Implementation of STEAM Extracurricular Programs in General Education Institutions - Lot 1 Basic Club Kits Georgia I2Q - Innovation, Inclusion and Quality ↗ | 48 mil US$ | Request for Quotations |
| 24 de setembro de 2026 | EDISON STORE LTD | Procurement of Resources Required for the Implementation of STEAM Extracurricular Programs in General Education Institutions Lot 2 – Standard Club Kits Georgia I2Q - Innovation, Inclusion and Quality ↗ | 29,1 mil US$ | Request for Quotations |
| 24 de setembro de 2026 | EDISON STORE LTD | Procurement of Resources Required for the Implementation of STEAM Extracurricular Programs in General Education Institutions Lot 3 – Educational Resources and T Georgia I2Q - Innovation, Inclusion and Quality ↗ | 99,6 mil US$ | Request for Quotations |
| 14 de setembro de 2026 | INDIVIDUAL CONSULTANT | Full-stack Developer Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 14,1 mil US$ | Individual Consultant Selection |
| 8 de setembro de 2026 | INDIVIDUAL CONSULTANT | Project Implementation Consultant Trans-Caspian Transport Corridor - Georgia Accessibility and Transport Enhancement Project ↗ | 375 mil US$ | Individual Consultant Selection |
| 7 de setembro de 2026 | EDISON STORE LTD | Procurement of Resources Required for the Implementation of STEAM Extracurricular Programs in General Education Institutions (Stationery Supplies for Public Sch Georgia I2Q - Innovation, Inclusion and Quality ↗ | 17,4 mil US$ | Request for Quotations |
| 1 de setembro de 2026 | LEPL MIKHEIL TUMANISHVILI STATE PROFESSIONAL FILM ACTOR THEATRE | Strengthening Teachers’ Capacity to Foster Interdisciplinary and Innovative Teaching in General Education Institutions Georgia I2Q - Innovation, Inclusion and Quality ↗ | 13,1 mil US$ | Consultant Qualification Selection |
| 1 de setembro de 2026 | INDIVIDUAL CONSULTANT | Procurement Specialist Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 12,4 mil US$ | Individual Consultant Selection |
| 31 de agosto de 2026 | LUKA DZIDZIKASHVILI, | Full-stack Developer Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 16,3 mil US$ | Direct Selection |
| 21 de agosto de 2026 | INNOVATECH | Electrical Cabling, Connectors, and Accessories for Mestia Aggregation Point Log-In Georgia ↗ | 160 US$ | Direct Selection |
| 20 de agosto de 2026 | INTELLCOM GROUP | Power Supply System Components for Mestia Aggregation Point Log-In Georgia ↗ | 1,67 mil US$ | Direct Selection |
| 19 de agosto de 2026 | GIORGI LOMSADZE | Full-stack Developer Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 24,9 mil US$ | Direct Selection |
| 19 de agosto de 2026 | 3. GIORGI METREVELI | Full-stack Developer Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 15,1 mil US$ | Direct Selection |
| 18 de agosto de 2026 | LIDER + | Engineer Consultancy Services for Civil Works of Fiber Optic Infrastructure rollout (Khulo-Akhaltsikhe-Borjomi) Log-In Georgia ↗ | 322 mil US$ | Least Cost Selection |
| 18 de agosto de 2026 | LLC HANS AND GRUBER | Marketing Communication Campaign for NAPR Digital Products Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 124 mil US$ | Request for Quotations |
| 17 de agosto de 2026 | ALTA RETAIL | Air Conditioning Equipment for Mestia Aggregation Point Log-In Georgia ↗ | 1,31 mil US$ | Direct Selection |
| 14 de agosto de 2026 | L&K | Procurement of Construction Works of Fiber Optic (passive) Infrastructure Deployment: Phase 4 (Kakheti-Tianeti) Log-In Georgia ↗ | 3,24 M US$ | Request for Bids |
| 14 de agosto de 2026 | BUILD-7 | Procurement of Construction Works of Fiber Optic (passive) Infrastructure Deployment: Phase 4 (Kakheti-Tianeti) Log-In Georgia ↗ | 3,24 M US$ | Request for Bids |
| 11 de agosto de 2026 | EDISON STORE LTD | Lot 1 – Universal Microprocessor System Starter Kits Georgia I2Q - Innovation, Inclusion and Quality ↗ | 1,71 mil US$ | Request for Quotations |
| 11 de agosto de 2026 | EDISON STORE LTD | Lot 2 – Basic Robotics Club Kits Georgia I2Q - Innovation, Inclusion and Quality ↗ | 18,9 mil US$ | Request for Quotations |
| 3 de agosto de 2026 | INDIVIDUAL CONSULTANT | Full-stack devloper Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 14,6 mil US$ | Individual Consultant Selection |
| 3 de agosto de 2026 | INDIVIDUAL CONSULTANT | Procurement Assistant Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 13,4 mil US$ | Individual Consultant Selection |
| 27 de julho de 2026 | GIS AND RS CONSULTING CENTER GEOGRAPHIC LLC | Supply and Installation of Georgia Land Information System (LIS) Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 733 mil US$ | Request for Proposals |
| 27 de julho de 2026 | CEINSYS TECH LIMITED (Índia) | Supply and Installation of Georgia Land Information System (LIS) Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 733 mil US$ | Request for Proposals |
| 27 de julho de 2026 | MAGNASOFT CONSULTING INDIA PRIVATE LIMITED (Índia) | Supply and Installation of Georgia Land Information System (LIS) Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 733 mil US$ | Request for Proposals |
| 24 de julho de 2026 | HYDROSOLUTIONS GMBH (Suíça) | Development and Operationalization of an Integrated Irrigation Monitoring and Analytical Platform for Strengthened Hydro-Agro Informatics in Georgia Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 519 mil US$ | Direct Selection |
| 22 de julho de 2026 | TRAINING CENTER OF JUSTICE OF GEORGIA | Retraining, Qualification Enhancement and One-Year Mentoring of Public Institution Employees within the Framework of National Spatial Data Infrastructure Contin Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 20,8 mil US$ | Direct Selection |
| 15 de julho de 2026 | AAM CONSULTING (Hungria) | Consulting Services for Data Identification, Assessment, and Methodology Development for Land Mass Valuation in Georgia Phase 1 and Phase 2 (GRAIL) Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 263 mil US$ | Consultant Qualification Selection |
| 14 de julho de 2026 | INDIVIDUAL CONSULTANT | Technical agribusiness/VC consultant under sub-component 1.2. Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 33,3 mil US$ | Individual Consultant Selection |
| 29 de junho de 2026 | B.R.L. INGENIERIE (França) | Technical assistance aimed at enhancing water resources management in Georgia and fostering capacity development within targeted departments on the National Env Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 246 mil US$ | Consultant Qualification Selection |
| 29 de junho de 2026 | ESPELIA (França) | Technical assistance aimed at enhancing water resources management in Georgia and fostering capacity development within targeted departments on the National Env Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 246 mil US$ | Consultant Qualification Selection |
| 24 de junho de 2026 | GETA-2013 | Fiber Optic (passive) Infrastructure Deployment: Phase 4 (Kvemo Kartli) Log-In Georgia ↗ | 2,73 M US$ | Request for Bids |
| 24 de junho de 2026 | G & K TECHNOLOGY | Fiber Optic (passive) Infrastructure Deployment: Phase 4 (Kvemo Kartli) Log-In Georgia ↗ | 2,73 M US$ | Request for Bids |
| 23 de junho de 2026 | MR. NIKOS EFTHYMIOU (Grécia) | International Sediment Expert Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 171 mil US$ | Direct Selection |
| 22 de junho de 2026 | IDEA DESIGN GROUP | Provision of Consulting Services in Digitalization through Consulting Centers (Growth Hubs) Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | 0 US$ | Quality Based Selection |
| 18 de junho de 2026 | NEXIA GEORGIA LLC | Provision of Consulting Services in Legal Issues through Consulting Centers (Growth Hubs) Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | 0 US$ | Quality Based Selection |
| 18 de junho de 2026 | BDO CONSULTING LLC | Provision of Consulting Services in Finance and Accounting through Consulting Centers (Growth Hubs) Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | 0 US$ | Quality Based Selection |
| 18 de junho de 2026 | NEXIA GEORGIA LLC | Provision of Consulting Services in Finance and Accounting through Consulting Centers (Growth Hubs) Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | 0 US$ | Quality Based Selection |
| 17 de junho de 2026 | BDO CONSULTING LLC | Provision of Consulting Services in Business Modeling and Strategic Planning through Consulting Centers (Growth Hubs) Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | 0 US$ | Quality Based Selection |
| 16 de junho de 2026 | HANS WIESENEGGER (Áustria) | International consultant (Hydrologist) for Review, Design, and Specification of River Gauging Stations Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 18,5 mil US$ | Direct Selection |
| 15 de junho de 2026 | INDIVIDUAL CONSULTANT | Lawyer Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | 23,1 mil US$ | Individual Consultant Selection |
| 10 de junho de 2026 | INDIVIDUAL CONSULTANT | Strategic Development Manager Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | 15,3 mil US$ | Individual Consultant Selection |
| 9 de junho de 2026 | SAKHYDROENERGOMSHENI LLC | Rehabilitation of the Narekvavi Irrigation System in Dusheti Municipality Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 1,58 M US$ | Request for Bids |
| 3 de junho de 2026 | GEPRA | Communication Strategy for National Spatial Data Infrastructure (NSDI) Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 30,1 mil US$ | Consultant Qualification Selection |
| 1 de junho de 2026 | NIKOLOZ DOLIDZE | Legal Compliance Officer Georgia I2Q - Innovation, Inclusion and Quality ↗ | 37,6 mil US$ | Direct Selection |
| 29 de maio de 2026 | BDO CONSULTING LLC | Training and Workshops for Micro, Small, and Medium Enterprises through Consulting Centers (Growth Hubs) Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | 116 mil US$ | Consultant Qualification Selection |
| 18 de maio de 2026 | NEW POWER 22 | Construction Works of FO (passive) infrastructure deployment: Phase 4 (Tbilisi-Marneuli-Tsalka) Log-In Georgia ↗ | 4,45 M US$ | Request for Bids |
| 13 de maio de 2026 | EMRERAY ENERJI İNŞAAT SANAYI VE TICARET (Turquia) | Construction Works of FO (passive) infrastructure deployment: Phase 4 (Tsalka-Akhalkalaki-Akhaltsikhe) Log-In Georgia ↗ | 7,04 M US$ | Request for Bids |
| 11 de maio de 2026 | HADI H. JAAFAR (Líbano) | Water Resources Modeling and Irrigation Systems Specialist Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 59,6 mil US$ | Direct Selection |
| 6 de maio de 2026 | PRODWARE GEORGIA | Windows Server 2025 Datacenter edition (Datacenter SKU), GUI, Core licenses covering 24 cores Log-In Georgia ↗ | 27 mil US$ | Request for Quotations |
| 29 de abril de 2026 | HYDRODIAGNOSTICS | Purchase and Installation of water measurement structures for Kvemo Samgori and Zeda Ru Irrigations Schemes Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 650 mil US$ | Request for Bids |
| 29 de abril de 2026 | SOMMER GMBH (Áustria) | Purchase and Installation of water measurement structures for Kvemo Samgori and Zeda Ru Irrigations Schemes Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 650 mil US$ | Request for Bids |
| 27 de abril de 2026 | INDIVIDUAL CONSULTANT | Preparation of Resettlement Action Plan (RAP) Compliance Report Energy Supply Reliability and Financial Recovery ↗ | 10,1 mil US$ | Individual Consultant Selection |
| 22 de abril de 2026 | TEGETA PREMIUM VEHICLES LTD | Purchase of two units of off-road vehicles Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 61,5 mil US$ | Request for Quotations |
| 21 de abril de 2026 | GEPRA | WUO Establishment Support and In-Field Training Program Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 396 mil US$ | Direct Selection |
| 21 de abril de 2026 | TOYOTA CENTER TEGATA LTD | Purchase of 1 unit of an off-road vehicle Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 69,3 mil US$ | Request for Quotations |
| 20 de abril de 2026 | INDIVIDUAL CONSULTANT | Digital Transformation Expert Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | 22,6 mil US$ | Individual Consultant Selection |
| 14 de abril de 2026 | YDA INSAAT SANAI VE TICARET A.S. (Turquia) | Supply and installation of submersible pumps, electrical installation; construction of flow regulator, concrete pipe and box culverts, short-span bridges, and f Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | 7,6 M US$ | Request for Bids |
Preços dos contratos adjudicados em Geórgia
A mediana é o valor do meio: metade dos contratos está abaixo, metade acima. O intervalo vai do quarto mais barato ao quarto mais caro.
| Tipo de contrato | Contratos | Mediana | Intervalo habitual | Maior contrato |
|---|---|---|---|---|
| Bens | 65 | 73,1 mil US$ | 18,9 mil US$ – 240 mil US$ | 3,16 M US$ |
| Obras | 40 | 2,96 M US$ | 1,66 M US$ – 4,83 M US$ | 8,34 M US$ |
| Serviços de consultoria | 205 | 55,4 mil US$ | 26,7 mil US$ – 152 mil US$ | 2,8 M US$ |
Estes valores abrangem contratos de tamanhos muito diferentes: compare o seu preço com contratos da mesma natureza e tamanho, e com o orçamento do projeto se estiver publicado.
Projetos financiados: em preparação e ativos
Os projetos em preparação publicarão suas licitações nos próximos meses. Registre-se como fornecedor junto ao mutuário e acompanhe os avisos.
| Projeto | Situação | Compromisso | Aprovação | Encerramento | Setor |
|---|---|---|---|---|---|
| Georgia Human Capital Program ↗ | Ativo | 400 M US$ | 22 de março de 2022 | 31 de dezembro de 2028 | Other Education |
| East-West Highway Corridor Improvement ↗ | Ativo | 140 M US$ | 3 de dezembro de 2015 | 30 de junho de 2025 | Rural and Inter-Urban Roads |
| East West Highway Corridor Improvement Project Additional Financing ↗ | Ativo | 110 M US$ | 8 de novembro de 2017 | Rural and Inter-Urban Roads | |
| Kakheti Connectivity Improvement Project ↗ | Ativo | 109 M US$ | 22 de março de 2022 | 31 de dezembro de 2027 | Rural and Inter-Urban Roads |
| Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | Ativo | 103 M US$ | 11 de maio de 2021 | 30 de junho de 2026 | Public Administration - Financial Sector |
| Georgia I2Q - Innovation, Inclusion and Quality ↗ | Ativo | 103 M US$ | 29 de maio de 2019 | 31 de março de 2026 | Other Education |
| Log-In Georgia ↗ | Ativo | 80 M US$ | 28 de agosto de 2020 | 31 de dezembro de 2025 | ICT Infrastructure |
| Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | Ativo | 75 M US$ | 24 de março de 2023 | 30 de setembro de 2029 | Other Agriculture, Fishing and Forestry |
| Energy Supply Reliability and Financial Recovery ↗ | Ativo | 70,7 M US$ | 23 de maio de 2019 | 31 de dezembro de 2025 | Energy Transmission and Distribution |
| Energy Supply Reliability and Financial Recovery Guarantee ↗ | Ativo | 50 M US$ | 23 de maio de 2019 | 31 de dezembro de 2024 | Energy Transmission and Distribution |
| Additional Financing for the Second Regional and Municipal Infrastructure Development Project ↗ | Ativo | 40,6 M US$ | 18 de maio de 2020 | Sub-National Government | |
| Enhancing Energy Security through Power Interconnection and Renewable Energy Program ↗ | Ativo | 35 M US$ | 21 de maio de 2024 | 30 de junho de 2029 |
Ver os concursos 8 Fornecedores e prestadores em Geórgia → Todos os países
Fonte: Banco Mundial, Contract Awards in Investment Project Financing e API de projetos, licença CC BY 4.0. Atualizado em 17 de novembro de 2026. Valores em dólares americanos.