Mikataba 314, $ M194, kampuni 167 tofauti. 64 % ya thamani ilikwenda kwa kampuni za nchi hiyo.
Kampuni zinazoshinda zaidi
| Kampuni | Nchi ya asili | Mikataba | Thamani | Kundi kuu |
|---|---|---|---|---|
| TRANS ENGINEERING GROUP | Uzibekistani | 2 | $ M13.2 | Works |
| EXPRESSSERVICE 2008 | Jojia | 1 | $ M8.34 | Works |
| JSC ERISIMEDI | Jojia | 3 | $ M7.69 | Works |
| YDA INSAAT SANAI VE TICARET A.S. | Uturuki | 1 | $ M7.6 | Works |
| REBUILD LTD | Jojia | 1 | $ M7.28 | Works |
| EMRERAY ENERJI İNŞAAT SANAYI VE TICARET | Uturuki | 1 | $ M7.04 | Works |
| INDIVIDUAL CONSULTANT | Jojia | 83 | $ M6.45 | Consultant Services |
| PARVUS GROUP | Jojia | 1 | $ M5.95 | Works |
| NSYSTEM | Jojia | 1 | $ M5.49 | Works |
| BALAVARI | Jojia | 1 | $ M5.44 | Works |
| Montran Corporation | Marekani | 2 | $ M5.08 | Goods |
| JV ERKERI AND COMFORT | Jojia | 1 | $ M5.05 | Works |
| YOOSHIN ENGINEERING CORPORATION | Korea Kusini | 2 | $ M5.04 | Consultant Services |
| CONSTRUCTION GROUP LLC | Jojia | 1 | $ M4.76 | Works |
| GBG LLC | Jojia | 2 | $ M4.61 | Works |
Mikataba iliyotolewa hivi karibuni
| Tarehe | Kampuni | Kazi | Thamani | Mbinu |
|---|---|---|---|---|
| 23 Oktoba 2026 | GREEN SYSTEMS LLC | Supply and Installation of Routers and Switches (Two Lots) Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 181 | Request for Bids |
| 12 Oktoba 2026 | INDIVIDUAL CONSULTANT | Financial Manager Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | $ elfu 30.1 | Individual Consultant Selection |
| 24 Septemba 2026 | EDISON STORE LTD | Procurement of Resources Required for the Implementation of STEAM Extracurricular Programs in General Education Institutions - Lot 1 Basic Club Kits Georgia I2Q - Innovation, Inclusion and Quality ↗ | $ elfu 48 | Request for Quotations |
| 24 Septemba 2026 | EDISON STORE LTD | Procurement of Resources Required for the Implementation of STEAM Extracurricular Programs in General Education Institutions Lot 2 – Standard Club Kits Georgia I2Q - Innovation, Inclusion and Quality ↗ | $ elfu 29.1 | Request for Quotations |
| 24 Septemba 2026 | EDISON STORE LTD | Procurement of Resources Required for the Implementation of STEAM Extracurricular Programs in General Education Institutions Lot 3 – Educational Resources and T Georgia I2Q - Innovation, Inclusion and Quality ↗ | $ elfu 99.6 | Request for Quotations |
| 14 Septemba 2026 | INDIVIDUAL CONSULTANT | Full-stack Developer Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 14.1 | Individual Consultant Selection |
| 8 Septemba 2026 | INDIVIDUAL CONSULTANT | Project Implementation Consultant Trans-Caspian Transport Corridor - Georgia Accessibility and Transport Enhancement Project ↗ | $ elfu 375 | Individual Consultant Selection |
| 7 Septemba 2026 | EDISON STORE LTD | Procurement of Resources Required for the Implementation of STEAM Extracurricular Programs in General Education Institutions (Stationery Supplies for Public Sch Georgia I2Q - Innovation, Inclusion and Quality ↗ | $ elfu 17.4 | Request for Quotations |
| 1 Septemba 2026 | LEPL MIKHEIL TUMANISHVILI STATE PROFESSIONAL FILM ACTOR THEATRE | Strengthening Teachers’ Capacity to Foster Interdisciplinary and Innovative Teaching in General Education Institutions Georgia I2Q - Innovation, Inclusion and Quality ↗ | $ elfu 13.1 | Consultant Qualification Selection |
| 1 Septemba 2026 | INDIVIDUAL CONSULTANT | Procurement Specialist Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 12.4 | Individual Consultant Selection |
| 31 Agosti 2026 | LUKA DZIDZIKASHVILI, | Full-stack Developer Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 16.3 | Direct Selection |
| 21 Agosti 2026 | INNOVATECH | Electrical Cabling, Connectors, and Accessories for Mestia Aggregation Point Log-In Georgia ↗ | $ 160 | Direct Selection |
| 20 Agosti 2026 | INTELLCOM GROUP | Power Supply System Components for Mestia Aggregation Point Log-In Georgia ↗ | $ elfu 1.67 | Direct Selection |
| 19 Agosti 2026 | GIORGI LOMSADZE | Full-stack Developer Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 24.9 | Direct Selection |
| 19 Agosti 2026 | 3. GIORGI METREVELI | Full-stack Developer Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 15.1 | Direct Selection |
| 18 Agosti 2026 | LIDER + | Engineer Consultancy Services for Civil Works of Fiber Optic Infrastructure rollout (Khulo-Akhaltsikhe-Borjomi) Log-In Georgia ↗ | $ elfu 322 | Least Cost Selection |
| 18 Agosti 2026 | LLC HANS AND GRUBER | Marketing Communication Campaign for NAPR Digital Products Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 124 | Request for Quotations |
| 17 Agosti 2026 | ALTA RETAIL | Air Conditioning Equipment for Mestia Aggregation Point Log-In Georgia ↗ | $ elfu 1.31 | Direct Selection |
| 14 Agosti 2026 | L&K | Procurement of Construction Works of Fiber Optic (passive) Infrastructure Deployment: Phase 4 (Kakheti-Tianeti) Log-In Georgia ↗ | $ M3.24 | Request for Bids |
| 14 Agosti 2026 | BUILD-7 | Procurement of Construction Works of Fiber Optic (passive) Infrastructure Deployment: Phase 4 (Kakheti-Tianeti) Log-In Georgia ↗ | $ M3.24 | Request for Bids |
| 11 Agosti 2026 | EDISON STORE LTD | Lot 1 – Universal Microprocessor System Starter Kits Georgia I2Q - Innovation, Inclusion and Quality ↗ | $ elfu 1.71 | Request for Quotations |
| 11 Agosti 2026 | EDISON STORE LTD | Lot 2 – Basic Robotics Club Kits Georgia I2Q - Innovation, Inclusion and Quality ↗ | $ elfu 18.9 | Request for Quotations |
| 3 Agosti 2026 | INDIVIDUAL CONSULTANT | Full-stack devloper Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 14.6 | Individual Consultant Selection |
| 3 Agosti 2026 | INDIVIDUAL CONSULTANT | Procurement Assistant Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 13.4 | Individual Consultant Selection |
| 27 Julai 2026 | GIS AND RS CONSULTING CENTER GEOGRAPHIC LLC | Supply and Installation of Georgia Land Information System (LIS) Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 733 | Request for Proposals |
| 27 Julai 2026 | CEINSYS TECH LIMITED (India) | Supply and Installation of Georgia Land Information System (LIS) Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 733 | Request for Proposals |
| 27 Julai 2026 | MAGNASOFT CONSULTING INDIA PRIVATE LIMITED (India) | Supply and Installation of Georgia Land Information System (LIS) Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 733 | Request for Proposals |
| 24 Julai 2026 | HYDROSOLUTIONS GMBH (Uswisi) | Development and Operationalization of an Integrated Irrigation Monitoring and Analytical Platform for Strengthened Hydro-Agro Informatics in Georgia Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 519 | Direct Selection |
| 22 Julai 2026 | TRAINING CENTER OF JUSTICE OF GEORGIA | Retraining, Qualification Enhancement and One-Year Mentoring of Public Institution Employees within the Framework of National Spatial Data Infrastructure Contin Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 20.8 | Direct Selection |
| 15 Julai 2026 | AAM CONSULTING (Hungaria) | Consulting Services for Data Identification, Assessment, and Methodology Development for Land Mass Valuation in Georgia Phase 1 and Phase 2 (GRAIL) Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 263 | Consultant Qualification Selection |
| 14 Julai 2026 | INDIVIDUAL CONSULTANT | Technical agribusiness/VC consultant under sub-component 1.2. Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 33.3 | Individual Consultant Selection |
| 29 Juni 2026 | B.R.L. INGENIERIE (Ufaransa) | Technical assistance aimed at enhancing water resources management in Georgia and fostering capacity development within targeted departments on the National Env Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 246 | Consultant Qualification Selection |
| 29 Juni 2026 | ESPELIA (Ufaransa) | Technical assistance aimed at enhancing water resources management in Georgia and fostering capacity development within targeted departments on the National Env Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 246 | Consultant Qualification Selection |
| 24 Juni 2026 | GETA-2013 | Fiber Optic (passive) Infrastructure Deployment: Phase 4 (Kvemo Kartli) Log-In Georgia ↗ | $ M2.73 | Request for Bids |
| 24 Juni 2026 | G & K TECHNOLOGY | Fiber Optic (passive) Infrastructure Deployment: Phase 4 (Kvemo Kartli) Log-In Georgia ↗ | $ M2.73 | Request for Bids |
| 23 Juni 2026 | MR. NIKOS EFTHYMIOU (Ugiriki) | International Sediment Expert Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 171 | Direct Selection |
| 22 Juni 2026 | IDEA DESIGN GROUP | Provision of Consulting Services in Digitalization through Consulting Centers (Growth Hubs) Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | $ 0 | Quality Based Selection |
| 18 Juni 2026 | NEXIA GEORGIA LLC | Provision of Consulting Services in Legal Issues through Consulting Centers (Growth Hubs) Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | $ 0 | Quality Based Selection |
| 18 Juni 2026 | BDO CONSULTING LLC | Provision of Consulting Services in Finance and Accounting through Consulting Centers (Growth Hubs) Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | $ 0 | Quality Based Selection |
| 18 Juni 2026 | NEXIA GEORGIA LLC | Provision of Consulting Services in Finance and Accounting through Consulting Centers (Growth Hubs) Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | $ 0 | Quality Based Selection |
| 17 Juni 2026 | BDO CONSULTING LLC | Provision of Consulting Services in Business Modeling and Strategic Planning through Consulting Centers (Growth Hubs) Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | $ 0 | Quality Based Selection |
| 16 Juni 2026 | HANS WIESENEGGER (Austria) | International consultant (Hydrologist) for Review, Design, and Specification of River Gauging Stations Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 18.5 | Direct Selection |
| 15 Juni 2026 | INDIVIDUAL CONSULTANT | Lawyer Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | $ elfu 23.1 | Individual Consultant Selection |
| 10 Juni 2026 | INDIVIDUAL CONSULTANT | Strategic Development Manager Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | $ elfu 15.3 | Individual Consultant Selection |
| 9 Juni 2026 | SAKHYDROENERGOMSHENI LLC | Rehabilitation of the Narekvavi Irrigation System in Dusheti Municipality Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ M1.58 | Request for Bids |
| 3 Juni 2026 | GEPRA | Communication Strategy for National Spatial Data Infrastructure (NSDI) Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 30.1 | Consultant Qualification Selection |
| 1 Juni 2026 | NIKOLOZ DOLIDZE | Legal Compliance Officer Georgia I2Q - Innovation, Inclusion and Quality ↗ | $ elfu 37.6 | Direct Selection |
| 29 Mei 2026 | BDO CONSULTING LLC | Training and Workshops for Micro, Small, and Medium Enterprises through Consulting Centers (Growth Hubs) Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | $ elfu 116 | Consultant Qualification Selection |
| 18 Mei 2026 | NEW POWER 22 | Construction Works of FO (passive) infrastructure deployment: Phase 4 (Tbilisi-Marneuli-Tsalka) Log-In Georgia ↗ | $ M4.45 | Request for Bids |
| 13 Mei 2026 | EMRERAY ENERJI İNŞAAT SANAYI VE TICARET (Uturuki) | Construction Works of FO (passive) infrastructure deployment: Phase 4 (Tsalka-Akhalkalaki-Akhaltsikhe) Log-In Georgia ↗ | $ M7.04 | Request for Bids |
| 11 Mei 2026 | HADI H. JAAFAR (Lebanon) | Water Resources Modeling and Irrigation Systems Specialist Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 59.6 | Direct Selection |
| 6 Mei 2026 | PRODWARE GEORGIA | Windows Server 2025 Datacenter edition (Datacenter SKU), GUI, Core licenses covering 24 cores Log-In Georgia ↗ | $ elfu 27 | Request for Quotations |
| 29 Aprili 2026 | HYDRODIAGNOSTICS | Purchase and Installation of water measurement structures for Kvemo Samgori and Zeda Ru Irrigations Schemes Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 650 | Request for Bids |
| 29 Aprili 2026 | SOMMER GMBH (Austria) | Purchase and Installation of water measurement structures for Kvemo Samgori and Zeda Ru Irrigations Schemes Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 650 | Request for Bids |
| 27 Aprili 2026 | INDIVIDUAL CONSULTANT | Preparation of Resettlement Action Plan (RAP) Compliance Report Energy Supply Reliability and Financial Recovery ↗ | $ elfu 10.1 | Individual Consultant Selection |
| 22 Aprili 2026 | TEGETA PREMIUM VEHICLES LTD | Purchase of two units of off-road vehicles Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 61.5 | Request for Quotations |
| 21 Aprili 2026 | GEPRA | WUO Establishment Support and In-Field Training Program Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 396 | Direct Selection |
| 21 Aprili 2026 | TOYOTA CENTER TEGATA LTD | Purchase of 1 unit of an off-road vehicle Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ elfu 69.3 | Request for Quotations |
| 20 Aprili 2026 | INDIVIDUAL CONSULTANT | Digital Transformation Expert Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | $ elfu 22.6 | Individual Consultant Selection |
| 14 Aprili 2026 | YDA INSAAT SANAI VE TICARET A.S. (Uturuki) | Supply and installation of submersible pumps, electrical installation; construction of flow regulator, concrete pipe and box culverts, short-span bridges, and f Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | $ M7.6 | Request for Bids |
Contract award prices in Jojia
The median is the middle amount: half of the contracts are below it, half above. The range goes from the cheapest quarter to the most expensive quarter.
| Type of contract | Contracts | Median | Usual range | Largest contract |
|---|---|---|---|---|
| Goods | 65 | $ elfu 73.1 | $ elfu 18.9 – $ elfu 240 | $ M3.16 |
| Works | 40 | $ M2.96 | $ M1.66 – $ M4.83 | $ M8.34 |
| Consulting services | 205 | $ elfu 55.4 | $ elfu 26.7 – $ elfu 152 | $ M2.8 |
These amounts cover contracts of very different sizes: compare your price with contracts of the same nature and size, and with the project budget if it is published.
Miradi inayofadhiliwa: inayoandaliwa na inayoendelea
Miradi inayoandaliwa itachapisha zabuni zake katika miezi ijayo. Jisajili kama msambazaji kwa taasisi inayokopa na ufuatilie matangazo yake.
| Mradi | Hali | Kiasi kilichoahidiwa | Idhini | Kufungwa | Sekta |
|---|---|---|---|---|---|
| Georgia Human Capital Program ↗ | Inaendelea | $ M400 | 22 Machi 2022 | 31 Desemba 2028 | Other Education |
| East-West Highway Corridor Improvement ↗ | Inaendelea | $ M140 | 3 Desemba 2015 | 30 Juni 2025 | Rural and Inter-Urban Roads |
| East West Highway Corridor Improvement Project Additional Financing ↗ | Inaendelea | $ M110 | 8 Novemba 2017 | Rural and Inter-Urban Roads | |
| Kakheti Connectivity Improvement Project ↗ | Inaendelea | $ M109 | 22 Machi 2022 | 31 Desemba 2027 | Rural and Inter-Urban Roads |
| Georgia Relief and Recovery for Micro, Small, and Medium Enterprises ↗ | Inaendelea | $ M103 | 11 Mei 2021 | 30 Juni 2026 | Public Administration - Financial Sector |
| Georgia I2Q - Innovation, Inclusion and Quality ↗ | Inaendelea | $ M103 | 29 Mei 2019 | 31 Machi 2026 | Other Education |
| Log-In Georgia ↗ | Inaendelea | $ M80 | 28 Agosti 2020 | 31 Desemba 2025 | ICT Infrastructure |
| Georgia Resilient Agriculture, Irrigation, and Land Project ↗ | Inaendelea | $ M75 | 24 Machi 2023 | 30 Septemba 2029 | Other Agriculture, Fishing and Forestry |
| Energy Supply Reliability and Financial Recovery ↗ | Inaendelea | $ M70.7 | 23 Mei 2019 | 31 Desemba 2025 | Energy Transmission and Distribution |
| Energy Supply Reliability and Financial Recovery Guarantee ↗ | Inaendelea | $ M50 | 23 Mei 2019 | 31 Desemba 2024 | Energy Transmission and Distribution |
| Additional Financing for the Second Regional and Municipal Infrastructure Development Project ↗ | Inaendelea | $ M40.6 | 18 Mei 2020 | Sub-National Government | |
| Enhancing Energy Security through Power Interconnection and Renewable Energy Program ↗ | Inaendelea | $ M35 | 21 Mei 2024 | 30 Juni 2029 |
Tazama zabuni za 8 Wasambazaji na watoa huduma Jojia → Nchi zote